EIA FOR THE PROPOSED LANGEZANDT QUAYS DEVELOPMENT IN STRUISBAAI HARBOUR: <strong>CRR</strong><br />

1.3.62<br />

1.3.63<br />

Johan Liebenberg,<br />

Dorel Van der<br />

Westhuizen, Kobus<br />

Viljoen, Abrie<br />

Bruwer, Chris Moll,<br />

Stuart Du Plessis,<br />

G. R. Youldon,<br />

Johan Venter (59,<br />

73, 69, 66, 65, 172,<br />

93, 78)<br />

Johan Liebenberg,<br />

Dorel Van der<br />

Westhuizen, Kobus<br />

Viljoen, Abrie<br />

Bruwer, Chris Moll,<br />

Stuart Du Plessis,<br />

G. R. Youldon,<br />

Johan Venter (59,<br />

73, 69, 66, 65, 172,<br />

93, 78)<br />

Opening an entrance to the parking lot from<br />

Kusweg Oos does not address the problem<br />

of one entrance to the harbour<br />

Further the proposed Kusweg Oos<br />

intersection is on a blind corner to two sides<br />

and is dangerous. Kusweg Oos asphalt<br />

surface is crumbling as it is, for it was<br />

merely an asphalt screening on the existing<br />

gravel road. It was never designed for<br />

buses or high density traffic.<br />

Please refer to Section 1.3.5 of this Comment<br />

and Response Report regarding congestion.<br />

Regarding the blind corner Alternative 4 of the<br />

Traffic Report ( Section 5.2.2) two stop signs<br />

are proposed which will make this intersection<br />

safer.<br />

Regarding the poorly designed road, it is the<br />

CAMs responsibility to ensure that municipal<br />

roads are properly designed and maintained.<br />

Traffic specialists (iCE Group) comment:<br />

a) The sight distance problem will be<br />

addressed through the provision of a threeway<br />

stop as shown on the plans.<br />

b) If that is the case, the road may have to be<br />

reconstructed. The municipality may request<br />

the developer to do the construction in lieu of<br />

a portion of bulk service contributions.<br />

Traffic flow &<br />

Parking<br />

Traffic flow &<br />

Parking<br />

I:\ENV\PROJECTS\401807~Struisbaai\Public Participation\Comments & Response\EIR\<strong>CRR</strong> <strong>IV</strong> <strong>FEIR</strong> ~ <strong>26042010</strong> [<strong>FINAL</strong>].doc 51 of 193

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!