EIA FOR THE PROPOSED LANGEZANDT QUAYS DEVELOPMENT IN STRUISBAAI HARBOUR: <strong>CRR</strong><br />
3.1.82<br />
3.1.83<br />
3.1.84<br />
3.1.85<br />
Stephen Knobel<br />
(137)<br />
Abrie Bruwer (66)<br />
D.G. & J.L. Falck<br />
(64)<br />
D.G. & J.L. Falck<br />
(64)<br />
The whole EIA is based on assumptions<br />
and predictions and cannot be verified or<br />
guaranteed. Allegations of broken promises<br />
by the client were made.<br />
The developer claims that the two storey<br />
building restriction is not enforced and<br />
backs this with pictures of 3 storey buildings<br />
that have sunken garages with two stories<br />
on top and are not three stories above<br />
ground.<br />
The EIA states that the proposed<br />
development will increase the length of the<br />
holiday season and I fail to see the logic<br />
behind this. South Africans are very<br />
sensitive to the weather, especially when it<br />
comes to seaside resorts. Cape Town is a<br />
prime example of this, where occupancy<br />
levels in winter is far lower than in summer<br />
months.<br />
It is also not true to state that Struisbaai<br />
does not have any facilities for tour busses<br />
and without the proposed development of<br />
Erf 848 the town will not have such facilities.<br />
This was an oversight in the reasoning of a<br />
developer.<br />
The EIA is based on specialist input as well as<br />
comments received for I&APs. Every<br />
reasonable measure has been taken to<br />
ensure reasonable confidence in the findings<br />
accuracy as well as sufficient information for<br />
the competent authority to make an informed<br />
decision. Assumptions and gaps in<br />
information are declared in Section ** as<br />
legally required.<br />
This was the case in accordance with the<br />
2006 SDF which has now been superceded<br />
by the 2009 CAM SDF which no longer makes<br />
provision for a two storey limitation. Section<br />
2.7 of <strong>FEIR</strong> states that the proponent plans to<br />
apply for the appropriate zonation and rights<br />
to meet the requirements of the proposed<br />
development.<br />
Economic Specialist: The financial<br />
sustainability inputs for Langezandt Quays<br />
indicate that the calculated risk that the<br />
proponent is willing to take is not misplaced.<br />
Financial sustainability cannot be guaranteed.<br />
However, the available evidence provides no<br />
reason to suspect financial failure and, as<br />
such, provides no clear basis to argue against<br />
the desirability of the development.<br />
Please refer to Annexure U of the <strong>FEIR</strong>.<br />
Economic Specialist: The financial<br />
sustainability inputs for Langezandt Quays<br />
indicate that the calculated risk that the<br />
proponent is willing to take is not misplaced.<br />
Financial sustainability cannot be guaranteed.<br />
However, the available evidence provides no<br />
reason to suspect financial failure and, as<br />
such, provides no clear basis to argue against<br />
the desirability of the development.<br />
Process<br />
Process<br />
Process<br />
Process<br />
Please refer to Annexure U of the <strong>FEIR</strong>.<br />
I:\ENV\PROJECTS\401807~Struisbaai\Public Participation\Comments & Response\EIR\<strong>CRR</strong> <strong>IV</strong> <strong>FEIR</strong> ~ <strong>26042010</strong> [<strong>FINAL</strong>].doc 140 of 193