28.12.2013 Views

CRR IV FEIR ~ 26042010 [FINAL].pdf - Environmental Projects

CRR IV FEIR ~ 26042010 [FINAL].pdf - Environmental Projects

CRR IV FEIR ~ 26042010 [FINAL].pdf - Environmental Projects

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

EIA FOR THE PROPOSED LANGEZANDT QUAYS DEVELOPMENT IN STRUISBAAI HARBOUR: <strong>CRR</strong><br />

Please refer to Section 5.2.2, and Annexure J<br />

of the <strong>FEIR</strong>.<br />

1.3.42<br />

1.3.43<br />

1.3.44<br />

1.3.45<br />

1.3.46<br />

Justine Sweet (97)<br />

A.F. & J.H. Tooke<br />

(67)<br />

GJ Pienaar (56)<br />

GJ Pienaar (56)<br />

GJ Pienaar (56)<br />

In respect of parking, we note that the<br />

calculation of the size of the bays is wholly<br />

inadequate given the fact that the parking<br />

bays will be required to accommodate boats<br />

and trailers as well. A rough calculation<br />

indicates that these bays should measure at<br />

least 14 m in length. Moreover, no<br />

provision is made for the large turning<br />

circles required in harbour areas where<br />

boats are being transported on trailers.<br />

The public also enjoy the use of public open<br />

space, and also as a playground for small<br />

children and more importantly access to the<br />

harbour by pedestrians occurs via this traffic<br />

area.<br />

Public parking is already available.<br />

Other businesses in the area would also<br />

benefit from this type of development.<br />

I, as the owner of erf 649 in Heidelaan, am<br />

not in favour of giving pardon to the owner<br />

of erf 572 of having to adhere to his duties<br />

for the following reasons:<br />

3. Erf 572 is too small to meet the parking<br />

requirements of a business property.<br />

The preferred traffic alternative 4 has been<br />

amended to make allowance for vehicle/boat<br />

trailers as this was highlighted at the Public<br />

Meeting (31 October 2009). Further<br />

amendments have been undertaken to<br />

accommodate a range of queries which were<br />

raised to contribute to a traffic alternative that<br />

meets the needs of the I&APs,<br />

Traffic consultants ( iCE Group) response:<br />

This is a valid point. Parking bays at other<br />

harbours (Gordon‟s Bay, Yzerfontein and<br />

existing Struisbaai parking) measures<br />

between 12,5 and 13 metres in length. It is<br />

recommended that parking on the harbour<br />

land should be reserved for boats and trailers,<br />

with the second access as shown on the<br />

drawings.<br />

It is assumed that reference is made to Erf<br />

921. This is public open space under the<br />

control of the CAM who are supportive of the<br />

concept to formalize Erf 921 into public<br />

parking. Please refer to the CAM letter in<br />

Annexure A of the <strong>FEIR</strong>.<br />

Agreed, however not formalized which is<br />

required to curtail the congestion experienced<br />

during peak periods.<br />

Your comment is noted.<br />

Please note we are assessing Erf 848 not Erf<br />

572 for development and Erf 921 for public<br />

parking. Your concern is however noted in<br />

relation to Erf 848 and Erf 921. Refer to<br />

Section 5.2.2 * which deals with proposed<br />

parking provisions.<br />

Traffic &<br />

parking<br />

Traffic flow &<br />

Parking<br />

Traffic flow &<br />

Parking<br />

Traffic flow &<br />

Parking<br />

Traffic flow &<br />

Parking<br />

I:\ENV\PROJECTS\401807~Struisbaai\Public Participation\Comments & Response\EIR\<strong>CRR</strong> <strong>IV</strong> <strong>FEIR</strong> ~ <strong>26042010</strong> [<strong>FINAL</strong>].doc 48 of 193

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!