28.12.2013 Views

CRR IV FEIR ~ 26042010 [FINAL].pdf - Environmental Projects

CRR IV FEIR ~ 26042010 [FINAL].pdf - Environmental Projects

CRR IV FEIR ~ 26042010 [FINAL].pdf - Environmental Projects

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

EIA FOR THE PROPOSED LANGEZANDT QUAYS DEVELOPMENT IN STRUISBAAI HARBOUR: <strong>CRR</strong><br />

1.1.6<br />

1.1.7<br />

1.1.8<br />

1.1.9<br />

1.1.10<br />

1.1.11<br />

Julian G Williams<br />

(47)<br />

E. Ley Kempthorne<br />

(49)<br />

Frances Pienaar<br />

(58)<br />

Frances Pienaar<br />

(58)<br />

Frances Pienaar<br />

(58)<br />

David McKinstry<br />

(21)<br />

1.1.12 David McKinstry<br />

(21)<br />

1.1.13<br />

David McKinstry<br />

(21)<br />

The proposed development will encroach<br />

the 100m from high water mark building<br />

restriction.<br />

The EIA Report mentions six different<br />

alternatives, four of which are rejected as<br />

being not accepted by the broader public<br />

and only two alternatives were considered<br />

in detail. The preferred alternative is not in<br />

line with the planning regulations in the<br />

area, namely 70% coverage and a height of<br />

only 2 stories, this option is clearly an<br />

attempt on the developer's side to maximise<br />

profits.<br />

The site is not zoned for a residential or<br />

hotel development.<br />

Four storey buildings are not allowed under<br />

the regulations in place.<br />

The proposed building will cover more than<br />

the regulated ground coverage allowances.<br />

The proposed building is in contradiction<br />

with the Spatial Development Plan for the<br />

area which allows for a limit of two stories<br />

and this should be enforced.<br />

The Tommy Brummer report is essentially a<br />

proposal to circumvent by application or<br />

negotiation substantive issues of coverage<br />

as well as height e.g. street access, loading<br />

bays and of course, site coverage.<br />

Apart from the fact that the proposed<br />

building would cover the whole site, the<br />

developer and his agents want to<br />

appropriate public land. They want to build<br />

on a servitude and access their<br />

development over public parking.<br />

This is one of the factors that triggered the<br />

basic assessment listed activities of R386.<br />

Refer to Section 1.3.1, Table 1.1.<br />

Please refer to Sections 2.6 and 2.7 of the<br />

<strong>FEIR</strong>.<br />

Please refer to Sections 2.6 and 2.7 of the<br />

<strong>FEIR</strong>.<br />

Please refer to Sections 2.6 and 2.7 of the<br />

<strong>FEIR</strong>.<br />

Please refer to Sections 2.6 and 2.7 of the<br />

<strong>FEIR</strong>.<br />

A new SDF has been passed in accordance<br />

with the Municipal Systems Act as of<br />

December 2009. The 2009 CAM SDF<br />

promotes development within the urban edge,<br />

of which Erf 848 is located. Please refer to<br />

Section 1.4 and 2.7 of the <strong>FEIR</strong><br />

The Tommy Brummer report provides detailed<br />

information in terms of the proposed process<br />

that would be applied for to secure the<br />

requisite zonation & amendment of certain<br />

title deed restrictions<br />

Please refer to Sections 1.3.8, 2.6 and 2.7 of<br />

the <strong>FEIR</strong>. Unless the servitude restriction<br />

amendment is approved, the proponent is<br />

required to respect the rights maintained in<br />

the title deeds regarding the servitude. The<br />

formalization of erf 921 for public parking and<br />

access as well as an entry/exit point was<br />

provisionally granted in accordance with the<br />

CAM letter in Annexure A of the <strong>FEIR</strong>.<br />

Planning<br />

Planning<br />

Planning<br />

Planning<br />

Planning<br />

Planning<br />

Planning<br />

Planning<br />

I:\ENV\PROJECTS\401807~Struisbaai\Public Participation\Comments & Response\EIR\<strong>CRR</strong> <strong>IV</strong> <strong>FEIR</strong> ~ <strong>26042010</strong> [<strong>FINAL</strong>].doc 8 of 193

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!