30.10.2012 Views

A Proposal for a Standard With Innovation Management System

A Proposal for a Standard With Innovation Management System

A Proposal for a Standard With Innovation Management System

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Stelian-Cornel Florica and George Draghici<br />

Structuring and decomposing each department and activity, may be seen in greater detail the<br />

components of a system PLM / PDM.<br />

Figure 2: PLM process (Siemens PLM solution Partner: http://www.itsplm.co.rs/)<br />

On numerous occasions companies, having already invested in ERP (Enterprise Resource Planning)<br />

systems with high levels of integration and customization, are unsure how an additional investment in<br />

a PLM solution would be beneficial. The following matrix of functionalities helps understand the<br />

operational requirements in a much better manner.<br />

Figure 3: Differences between PLM and PDM<br />

A closer look at the matrix helps us understand the differentiation between PLM and PDM. It is<br />

common to find a PLM solution being used predominantly <strong>for</strong> the PDM functionalities since the other<br />

facets of PLM have either already been developed on an ERP/ MRP system or a home-grown<br />

specialized toolset addresses most of the other aspects of the PLM. (Manage Critical Design<br />

Knowledge, 2008)<br />

The main advantage of PLM, in this case, is that it allows the integration of all in<strong>for</strong>mation about a<br />

product or service and it can organize all this in<strong>for</strong>mation in order to improve efficiency between<br />

different departments within the company. Dividing the activities of a company of a several<br />

departments such as design, manufacture, sales and service, it can reduce the complexity. Increasing<br />

the effectiveness of each department, result is the increase of productivity throughout the company.<br />

Currently, most of companies use PLM / PDM plat<strong>for</strong>ms from the same developer. This has the major<br />

disadvantage because some plat<strong>for</strong>ms are difficult to be understood, manage and to use. This<br />

situation can be improved by testing and implementing various plat<strong>for</strong>ms from various developers,<br />

237

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!