12.07.2015 Views

Electrical Power for Valdez and the Copper River Basin-1981

Electrical Power for Valdez and the Copper River Basin-1981

Electrical Power for Valdez and the Copper River Basin-1981

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Power</strong> Requirement Study (excerpt)Anchorage <strong>and</strong> o<strong>the</strong>r larger cities, also increases. In<strong>for</strong>mation fromAlaska Labor Force Estimates also indicates an increase in <strong>the</strong> governmentwork<strong>for</strong>ce in <strong>the</strong> area.Street LightsNormal usage <strong>for</strong> street lights was assumed to remain at presentlevels. Three additional street light installations are expected within<strong>the</strong> next 10 years as normal expansion of <strong>the</strong> community occurs.Large CommercialThe average annual kWh <strong>for</strong> this class has been estimated to show amoderate increase. Consumers have shown a slow but gradual increase <strong>the</strong>past 10 years. Consumers have increased from 22 in 1974 to <strong>the</strong> present33 in 1978. Consumers were projected to increase during <strong>the</strong> future10-year period at approximately one-half <strong>the</strong> rate previously experienced.Over 350 kVAThe system presently serves 4 loads in excess of 350 kVA, namely:1. <strong>Valdez</strong> Memorial Hospital2. <strong>Valdez</strong> City Schools3. Fluor Staff Housing4. Farm <strong>and</strong> Sea of AlaskaThe Fluor Staff Housing load consists of a housing development whichis presently being reclassified to residential. 54 units have beencompletely removed from <strong>the</strong> area, 28 have already been reclassified in1978 <strong>and</strong> <strong>the</strong> remaining 118 units are scheduled to be transferred during1979 <strong>and</strong> 1980. There<strong>for</strong>e, this load has been phased out of operationafter 1980.Farm <strong>and</strong> Sea of Alaska is a new load which was connected February 2,1979. No historical data is available <strong>for</strong> this load. Estimates havebeen prepared based on in<strong>for</strong>mation supplied by <strong>the</strong> consumer.A potential load which exists, but has not been'considered in <strong>the</strong>estimates, is <strong>the</strong> expansion of <strong>the</strong> <strong>Valdez</strong> City Dock. The bond issue <strong>for</strong><strong>the</strong> port facilities is sCheduled to go be<strong>for</strong>e <strong>the</strong> voters April 10, 1979<strong>and</strong>, if approved, construction would begin in early 1980. Completion of<strong>the</strong> dock facilities would be expected in <strong>1981</strong>.8-20

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!