6. ENDANGERED AND THREATENED SPECIES:No endangered or threatened flora <strong>and</strong> fauna, as listed in <strong>the</strong> FederalRegister, Vol. 44, No. 12, 17 January 1979, "List of Endangered <strong>and</strong>Threatened Wildlife <strong>and</strong> Plants" <strong>and</strong> subsequent updates, would be impactedby <strong>the</strong> proposed project. No critical habitat would be destroyed ormodi fied which would jeopardize <strong>the</strong> continued existence of an endangeredor threatened species.7. WETLANDS:Wetl<strong>and</strong> species impacted by this proposal include: rockweed (Fucusdisticus) <strong>and</strong> coraline algae. The project site is not considered to be aproductively vegetated wetl<strong>and</strong>. This project would not adversely impact<strong>the</strong> wetl<strong>and</strong> resource.8. SUBMERGED VEGETATION:The project site is vegetated with submerged vegetation. The followingspecies are located on <strong>the</strong> site: rockweed <strong>and</strong> coraline algae. Thisproject would not adversely impact this wetl<strong>and</strong> resource.9. APPROPRIATE ALTERNATIVES:a. No Action: The no action alternative may cause erosion <strong>and</strong> scourin both Port <strong>Valdez</strong> <strong>and</strong> Allison Creek. This alternative would not beenvironmentally acceptable.b. Reduced Fill Size: The fill is at <strong>the</strong> smallest practicable size.c. Modi fy Fill Location or Dimensions: The location is below <strong>the</strong>outfall at <strong>the</strong> MHHN level <strong>and</strong> cannot be located at any o<strong>the</strong>r site.10. WATER DEPENDENCY:The purpose of <strong>the</strong> project is water dependent or water oriented.activities taking place on <strong>the</strong> fill are water oriented in nature.is a water dependent need <strong>for</strong> <strong>the</strong> proposed project.11. DISPOSAL SITE SELECTION:AllThereThe disposal site has been selected to be <strong>the</strong> least environmentallydamaging. There are no alternate disposal sites available which are lessenvironmentally sensitive <strong>and</strong> still feasible <strong>for</strong> <strong>the</strong> proposed project.The disposal site has been limited to its smallest practical size.3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!