12.07.2015 Views

Electrical Power for Valdez and the Copper River Basin-1981

Electrical Power for Valdez and the Copper River Basin-1981

Electrical Power for Valdez and the Copper River Basin-1981

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

list was classified into <strong>the</strong> 76 most economical, Allison Creek was notincluded. Higher fuel co~ts have since changed <strong>the</strong> economic outlook.Allison Creek project has not previously been studied as a lake tapscheme, o<strong>the</strong>r than in <strong>the</strong> above mentioned, Corps report. However, <strong>the</strong>project with a dam has been included as an alternative or an adjunct toSolomon Gulch in studies by Robert W. Re<strong>the</strong>r<strong>for</strong>d Associates (see bibliographyitems 8, 10, 15). Re<strong>the</strong>r<strong>for</strong>d, as well as <strong>the</strong> Corps, concludedthat <strong>the</strong> scheme with a dam was not feasible.Load <strong>for</strong>ecasts of <strong>the</strong> <strong>Valdez</strong>/Glennallen area have been reported inseveral reports •. <strong>Copper</strong> Valley Electric Association <strong>and</strong> REA jointlystudy future loads about every two years. Results are shown in severalSolomon Gulch studies <strong>and</strong> in <strong>the</strong> Robert W. Re<strong>the</strong>r<strong>for</strong>d Asssociates reportsof po~er supply (see bibliography items 1, 3, 9, 10, 11, 15, 17, 18).The ,Upper Susitna <strong>River</strong> Project Market Study completed by APA in 1979<strong>and</strong> <strong>the</strong> Alaska Water Study Committee S.C. Alaska Level B Phase I studyinclude sections on <strong>the</strong> <strong>Valdez</strong>/Glennallen area.2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!