TABLE 0-3 (cont)CostAccountNumber Description or Item Un it Quant ity04.3 ACCESS ADIT AND STAG1NG AREAExcavationRockCYCommonCYConcreteCYRein<strong>for</strong>cementLBExcavation (Adit) rock CYRockbolts, 1" x 10' EA04.5TOTAL - ACCESS AOITPOWER TUNNELTunnel Excavation (Rock) CYConcrete LiningCYRein<strong>for</strong>cementLBRock Bolts, l"xlO'EAPortal (Including SecondaryRock Trap, Transition, StagingArea <strong>and</strong> Haul Road)Rock ExcavationOverburdenConcreteRein<strong>for</strong>cementRock Bolts, 1"x14'.Roc k Bo lt s, 1" x 7 'Rails <strong>and</strong> Track~TrestleTOTAL - POWER TUNNEL04.5 PENSTOCKSteel, 48"0Ring Stiffeners, Exp.Anchors, Anchor SupportsConcrete Support PiersConcrete Anchor Block~TOTAL - PENSTOCK07 POWERPLANTCYCYCYLBEAE A. LfLS3, 1801,360954,800.21513021,7634,889244,4508,33817,014150,009 .17211, 100901308001LB 1,976,600LB 138,362CY 296. CY 25Uri itCostilL75156000.752003002256000.7521030107000.7546027550100,0002.503300300Tota 1·Cost($1,000)238.520.4573.64339401.54,896.72,933.4183.31,751.0510.41,500. 1120.48.341 .435.74010012,120.74,941.5.415. 188.87.55,452.907. 1 POWERHOUSEMobilization & PreparatoryWorkExcavation <strong>and</strong> ConcreteLSLS120,000230,0001202300-8

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!