12.07.2015 Views

Electrical Power for Valdez and the Copper River Basin-1981

Electrical Power for Valdez and the Copper River Basin-1981

Electrical Power for Valdez and the Copper River Basin-1981

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

ALASKA POWER AUTHORITY333 WEST 4th AVENUE - SUITE 31 - ANCHORAGE, ALASKA 99501Phone: (907) 277-7641(907) 276-2715February 25, <strong>1981</strong>Colonel Lee R. NunnAlaska District EngineerU. S. Army Corps of EngineersPost Office Box 7002Anchorage, Alaska 99510Dear Colonel Nunn:The Alaska <strong>Power</strong> Authority would support state funding of 10% of <strong>the</strong>costs of construction of <strong>the</strong> Allison Creek Hydroelectric Project near<strong>Valdez</strong>, Alaska if <strong>the</strong> project is determined to be feasible <strong>and</strong> <strong>the</strong> bestfuture source of power <strong>for</strong> <strong>the</strong> market area. As you know, <strong>the</strong> State ofAlaska is currently completing feasibility studies of Susitna <strong>and</strong> a Railbelttransmission line, <strong>and</strong> ei<strong>the</strong>r <strong>the</strong> <strong>Copper</strong> Valley Electric Associationor <strong>the</strong> City of <strong>Valdez</strong> may install a pressure reducing turpine on <strong>the</strong>Alyeska oil pipeline. There<strong>for</strong>e, <strong>the</strong> definite decision to proceed withdevelopment of Allison Creek should await decisions on <strong>the</strong>se projects <strong>and</strong>refinement of dem<strong>and</strong> <strong>for</strong>ecasts in <strong>the</strong> market area.State funding participation in <strong>the</strong> project would require legislativeappropriation once a clear decision can be made. With this in mind, Iwill request that Governor Hammond prepare a letter of support <strong>for</strong> continuedfield investigations <strong>and</strong> preparation of a General Design Memor<strong>and</strong>um<strong>for</strong> Allison Creek, with <strong>the</strong> underst<strong>and</strong>ing that State funding of a portionof construction costs must be delayed until o<strong>the</strong>r studies are completed<strong>and</strong> <strong>the</strong> need <strong>for</strong> <strong>the</strong> project becomes more definite.cc:Governor HammondSincerely,cc..~.\J~Eric P. Yould "\Executive Director

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!