12.07.2015 Views

Electrical Power for Valdez and the Copper River Basin-1981

Electrical Power for Valdez and the Copper River Basin-1981

Electrical Power for Valdez and the Copper River Basin-1981

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

TABLE D- 3 (cont)Cost Unit Tota 1Account Cos t CostNumber Description or Item Unit Quantity ilL (~1,000)07. 1 POWERHOUSE (cont)Building Superstructure LS 1 72,000 72Misc. Building Item LS 1 97,000 97Bifurcation & LS 1 36,000 36Branch PipeValves EA 2 145,000 290TOTAL - POWERHOUSEB4507.2 TURBINES AND GENERATORSTurbines, Governor & EA 2 30B,500 617Coolinq SystemGenerators & Excitation EA 2 600,000 1,200Equipment--TOTAL - TURBINES AND GENERATORS 1,B1707.3 ACCESSORY ELECTRICAL EQUIPMENTSwitchgear, Breaker & LS 211,000 211Busses & StationService UnitSupervisory Control LS 317,000 317SystemMisc. <strong>Electrical</strong> System LS 36,000 36TOTAL - ACCESSORY ELECTRICAL EQUIPMENT 56407.4 AUXILLARY SYSTEMS AND EQUIPMENTHeating & Ventilating LS 7,000 7Eq u i pment Br i dge Cr ane LS 120,000 120& Misc. MechanicalSystems--TOTAL - AUXILLARY SYSTEMS AND EQUIPMENT 12707.5 SvJI TCHYARD<strong>Power</strong> Trans<strong>for</strong>mer LS 222,000 222Disconnects & <strong>Electrical</strong> LS lB,OOO lBEqu i pmentTOTAL - SWITCHYARD 2400-9

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!