12.07.2015 Views

Electrical Power for Valdez and the Copper River Basin-1981

Electrical Power for Valdez and the Copper River Basin-1981

Electrical Power for Valdez and the Copper River Basin-1981

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

alteration of <strong>the</strong> temperature regime through mixing base flows inAllison Creek with project flows. An extension of <strong>the</strong> one yearrecording period may be necessary.As additional in<strong>for</strong>mation is available <strong>for</strong> a thorough assessment ofimpacts due to potential changes in flow <strong>and</strong> temperature regimes,o<strong>the</strong>r alternatives <strong>for</strong> <strong>the</strong> discharge to Port <strong>Valdez</strong> may be acceptableor recommended. For example: (1) operation of <strong>the</strong> project only <strong>for</strong>base load pmver production would eliminate <strong>the</strong> radical flow variationsassociated wi th a peaking facility, (2) alterations in <strong>the</strong> dischargeof flow· from <strong>the</strong> tailrace in response to power dem<strong>and</strong> could be doneincrementally by a specified discharge in a given time period (ex.10 cfs/hour), (3) discharge of excess flows directly into Port<strong>Valdez</strong> could be done via .a flume or manmade channel <strong>and</strong> dischargedsub tidally only from June through September.Recent in<strong>for</strong>mation on spawning populations in Allison Creek is alsolacking. Beginning in 1980, escapement counts should be taken atleast once a month in July, August, <strong>and</strong> September of each year.These surveys should continue through <strong>the</strong> planning, construction,<strong>and</strong> operation phase of <strong>the</strong> project to allow assessment of projectimpacts upon salmon populations.A dual tailrace design as proposed <strong>for</strong> <strong>the</strong> lower powerhouse alternativeshould be included in plans <strong>for</strong> <strong>the</strong> upper powerhouse alternativeas well. The impacts associated with <strong>the</strong> potentfal changesto flow <strong>and</strong> temperature regimes described previously would occur atei<strong>the</strong>r powerhouse alternative unless appropriate mitigation featuresare incorporated into project design. In fact, construction <strong>and</strong>operation of <strong>the</strong> upper powerhouse with <strong>the</strong> dual tailrace feature isfavored slightly because stabilizing <strong>the</strong> flows in that stream reachbetween <strong>the</strong> lower <strong>and</strong> upper site would benefit fish resources in agreater portion of <strong>the</strong>ir habitat.To prevent scouring <strong>and</strong> downstream sedimentation, energy dissipatorsshould be installed in both <strong>the</strong> tailrace <strong>and</strong> outlet of <strong>the</strong> 6 inchdiversion pipe to Allison Creek. Design of <strong>the</strong> dissipators shouldinsure that <strong>the</strong> velocity of <strong>the</strong> discharge into Allison Creek willnot exceed <strong>the</strong> optimum velocity of <strong>the</strong> natural stream <strong>for</strong> fishmaintenance.The timing of construction will be of considerable importance inminimizing impacts to fish. The work should be done to avoid criticalbiological life stages. Disturbance of <strong>the</strong> water quality orstreambed morphology while eggs are incubating or fry are emergingcan result in direct mortality through suffocation by burial orphysical damage. Disturbance ,",hile adults are present can disruptor prevent spawning <strong>and</strong> l:Lmit production of future generations. Thetiming of any inwater construction activity or construction on th.ebanks of Allison Creek should he coordinated with <strong>the</strong> FWS, NationalMarine Fisheries Service (ID-IFS) ,<strong>and</strong> <strong>the</strong> ADF&G to avoid unnecessaryimpact on <strong>the</strong> salmon population. Also, because highest densities ofpopulations of spawning salmon occur in odd years, major constructionaffecting flows should be done on even years.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!