TABL E 0-4 (cont)Co st Unit To ta 1Account Cos t CostNumber Description or Item Unit Qu ant ity ilL(~l,OOO)·07.6 TAILRACE CHANNELOverburden Excavation CY 48 10 0.5Rock Excavation CY 20 25 0.5Concrete CY 38 300 11.4Rein<strong>for</strong>cement LB 1 ,900 0.75 5.2Steel P·i pe LB 270,440 2.25 608.5Misc. Steel LB 27,044 2.50 67.6R i pr ap CY 42 30 1.3Stoplogs EA 2 7,000 14.0TOTAL - TAILRACE CHANNEL 70907.7 TRANSMISSION LINE(WITH INSPErTION ACCESS TRAIL)Clearing AC 40 2,500 100Line ro nductors & MILE 3.5 65,000 227.5Single Wood PoleStructures (55 pcs)TOTAL - TRANSMISSION LINE 327.519 BUILDINGS, GROUNDS, AND UTILITIESMaintenance Equipment& SupplyStorage Warehouse LS 250,000 250--TOTAL - BUILDINGS, GROUNDS, AND UTILITIES 250--SUBTOTAL - CONSTRUCTION COSTS 24,50620% rONTINGENCIES 4,901TOTAL - CONTRACT COSTS 29,40730 ENGINEERING AND DESIGN (8%) 2,35331 SUPERVISION AND ADMINISTRATION (8% ) 2,541TOTAL - PROJECT COST 34,301D-14

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!