Table VIII-5Average Rate ComparisonsAnnual Firm AnnualCost Energy RateAllison Creek 1 $3,489,521 34.3 GWh 10.2¢/kWhAllison Creek 2 3,229,176 32.2 10.0PRT 1,365,000 56 2.4Railbelt Interconnection 3,813,000 50 12.5 to 14Diesels - 1979 3,377,564 41.5 8.1- 1980 estimate 10.7From Chapter IV:1979 Residential Rate <strong>for</strong> 1,000 kWh/month Use<strong>Valdez</strong> 14.015.71979 Revenue Received per Energy Unit SoldCVEA Residential 13.1CVEA Total 12.4<strong>Valdez</strong> Total 11.548