12.07.2015 Views

Electrical Power for Valdez and the Copper River Basin-1981

Electrical Power for Valdez and the Copper River Basin-1981

Electrical Power for Valdez and the Copper River Basin-1981

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

U.S. Forest Service when <strong>the</strong> line location is established. Construction<strong>and</strong> maintenance of <strong>the</strong> transmission 1 ine would be by road <strong>and</strong> helicopter.A cleared 10-foot wide hiking trail would be provided <strong>for</strong> inspectionaccess.The transmission 1 ine would be approximately 0.5 mile longer <strong>for</strong> <strong>the</strong>alternate powerhouse No.2 but <strong>the</strong> terrain is of similar characteristicthroughout <strong>the</strong> transmission line.BUILDINGS, GROUNDS, AND UTILITIESNo permanent housing <strong>and</strong> maintenance facilities would be requiredexcept <strong>for</strong> a small warehouse <strong>for</strong> maintenance equipment <strong>and</strong> supplystorage. Existing dirt roads would be used as necessary duringconstruction <strong>and</strong> operation of <strong>the</strong> project. No sewer <strong>and</strong> water systemswould be required except those in <strong>the</strong> powerhouse.COST ESTIMATESAll estimates are based on October 1980 price levels. Thecontingency used <strong>for</strong> all alternatives was 20 percent. Engineering <strong>and</strong>Design, <strong>and</strong> Supervision <strong>and</strong> Administration costs are each 8 percent ofconstruction costs. The cost data was obtained from bid prices on recentmajor power projects in <strong>the</strong> Pacific Northwest <strong>and</strong> Alaska, <strong>and</strong> adjusted toreflect current price levels, Alaska labor costs, <strong>and</strong> transportationcosts to <strong>the</strong> sites. T~e construction time was estimated to take 4 years<strong>and</strong> power-on-line would be 1988 or 1990.D-4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!