12.07.2015 Views

Electrical Power for Valdez and the Copper River Basin-1981

Electrical Power for Valdez and the Copper River Basin-1981

Electrical Power for Valdez and the Copper River Basin-1981

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Pressure Reducing Turbine - Hydroelectric <strong>and</strong> O<strong>the</strong>r Proposed RegionalActivities4. Several o<strong>the</strong>r activities have ei<strong>the</strong>r been proposed or are underconstruction in <strong>the</strong> study area. These include <strong>the</strong> construction of <strong>the</strong>city dock, transmission line to Glennallen, improvements on <strong>the</strong>Richardson Highway, <strong>and</strong> <strong>the</strong> construction of <strong>the</strong> Alaska PetrochemicalCompany (ALPETCO) refining facility. Concurrent construction activitiesin <strong>the</strong> <strong>Valdez</strong> area could cause a "boom - bust" type situation causingextreme economic impacts to <strong>Valdez</strong>. Tnis impact could be reduced withproper preparedness by <strong>the</strong> city of <strong>Valdez</strong>.G. PUBLIC INVOLVEMENT1. PUblic Involvement ProgramFormal public hearings were conducted at <strong>Valdez</strong> on 26 April 1977, 24July 1978, <strong>and</strong> 18 November 1980 to obtain public opinion describing <strong>the</strong>need <strong>for</strong> power generation, <strong>and</strong> alternative preference. Local response isstrongly in support of <strong>the</strong> selected plan. Coordination with Federal <strong>and</strong>State agencies, <strong>and</strong> local interest groups during <strong>the</strong> course of <strong>the</strong> studyinclude:U.S. Fish <strong>and</strong> Wildlife ServiceNational Marine Fisheries ServiceAlaska Department of Fish <strong>and</strong> GameState Historic Preservation Officer<strong>Copper</strong> Valley Electric AssociationAleyska Pipeline Service Company2. Required CoordinationThe final EIS was filed with tne Environmental Protection Agencyconcurrently with circulation to all parties on <strong>the</strong> project mailinglist. EPA will publish a notice of availability in <strong>the</strong> Federal Registerwhich will begin <strong>the</strong> 30-day review period. All comments received from<strong>the</strong> draft EIS are addressed in Appenaix J. The Feasibility Report <strong>and</strong>FEIS will be submitted to Congress <strong>and</strong> an exemption under Section 404(r)of <strong>the</strong> Clean Water Act will be obtainea.3. Statement ReceipientsA list of statement recipients is in Appendix I.H. COASTAL ZONE MANAGEMENTThe proposed project has been reviewed to assure that it will beundertaken in a manner consistent with <strong>the</strong> Alaska Coastal ManagementProgram to <strong>the</strong> maximum extent practicable. Coordination through <strong>the</strong> A-95Clearinghouse review <strong>for</strong> processing has been accomplished <strong>and</strong> agenciesreviewing <strong>the</strong> DEIS did not comment on any major Alaska Coastal ManagementEIS-18

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!