12.07.2015 Views

Electrical Power for Valdez and the Copper River Basin-1981

Electrical Power for Valdez and the Copper River Basin-1981

Electrical Power for Valdez and the Copper River Basin-1981

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

SYSTEMOF ACCOUNTSAccountsPlan AAll ~iesel Generation(Without Condition)Plan B Plan C Plan 0f)i ese 1 & PRT Diesel & Hydro PRT & Hydro1984 1990 1984 1990l. National EconomicDevelopment (NED)a. Beneficial Impacts<strong>Power</strong> ProductionEmployment Benefits2, 100,000 3,835,000 5,234,000119,000 119,000TOTAL NED BENEFIT~(annua 1 )2,100,000 3,954,000 5,353,000Location of Tmpacts4'>Ul<strong>Power</strong> Production<strong>Power</strong> will be utilizedin <strong>the</strong> <strong>Copper</strong> ValleyElectric Service AreaGlennallen-<strong>Valdez</strong> &vicinity.Same Same SameEmploymentb. Adverse ImpactsConstruction CostsEmployment would remainapproximately<strong>the</strong> same as present.A slight in- Employment would Samecrease inbe gained byemployment<strong>Valdez</strong>, Alaska.may take place;however it shouldnot be a substanti a 1 increase.TOTAL NED COSTS(annual)852,000 2,110,000 2,962,000

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!