Electrical Power for Valdez and the Copper River Basin-1981

Electrical Power for Valdez and the Copper River Basin-1981

Electrical Power for Valdez and the Copper River Basin-1981

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

TABLE VIII-1BSummary Cost EstimateOctober 1980 Price LevelAllison Creeek (Lake Tap) Alternate No. 28 MW; 32,200 MWh firm annual energy; 37,250 MWh average annual energy.L<strong>and</strong>s <strong>and</strong> Damages $ 724,000Hydraulic Works 17,563,000<strong>Power</strong>p1ant, Switchyard, <strong>and</strong> Transmission System* 4,629.000Miscellaneous (Mobilization, Buildings, etc.) 1,590,000Contingencies (20%) 4,901,000Engineering <strong>and</strong> Design (8%) 2,353,000Supervision <strong>and</strong> Administration (8%)2,54l,000Subtotal - Contract Cost $34,301,000Interest During Construciton (8% <strong>for</strong> 2 years) 2,744,080Total Investment Cost $37,045,080Average Annual Cost (8% <strong>for</strong> 50 years)or $ 4,631/kW=Tota1 Investment x 0.081743 $ 3,028,176Operation, Maintenance, <strong>and</strong> Replacement 201,000Total Average Annual Cost $ 3,229,176=10.0C/kWh (firm)* Allison Creek powerp1ant to Solomon Gulch transmission line tap;3.5 miles.41

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!