12.07.2015 Views

Electrical Power for Valdez and the Copper River Basin-1981

Electrical Power for Valdez and the Copper River Basin-1981

Electrical Power for Valdez and the Copper River Basin-1981

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

RESPONSES TO RECOMMENDATIONS of <strong>the</strong> U.S. Fish <strong>and</strong> Wildlife Service in <strong>the</strong>Final Coordination Act Report.1. That <strong>the</strong> design of <strong>the</strong> powerhouse allow <strong>the</strong> release of regulatedflows to Allison Creek throught <strong>the</strong> tailrace <strong>and</strong> excess flows to Port<strong>Valdez</strong> through <strong>the</strong> o<strong>the</strong>r tailrace.Response: The selected plan includes a two tailrace system which wouldallow regulated flows to both Allison Creek <strong>and</strong> Port <strong>Valdez</strong>.2. That flows from <strong>the</strong> powerhouse tailrace to Port <strong>Valdez</strong> be dischargedsubtida11y to at least -10 feet MLLW from June through September.Response: During <strong>the</strong> advanced engineering <strong>and</strong> design phase, studies willbe conducted to determine stream temperatures with project operation. If<strong>the</strong>se studies indicate <strong>the</strong> stream temperature during <strong>the</strong> spawning wouldbe below <strong>the</strong> critical level <strong>and</strong> all <strong>the</strong> project discharge could not bedischarged into Allison Creek during spawning, mitigative measures, suchas a subtidal outlet would probao1y be employed.3. That <strong>the</strong> proposed start-up of project operation affecting <strong>the</strong> naturalflows in Allison Creek occur in an even year.Response: The initial drawdown <strong>for</strong> securing <strong>the</strong> tap <strong>and</strong> <strong>the</strong> placement oftrash racks would probably occur during <strong>the</strong> winter months when flows into<strong>the</strong> Port <strong>Valdez</strong> tai1ace <strong>and</strong> would have no impacts on <strong>the</strong> incubating eggswithin Allison Creek <strong>and</strong> <strong>the</strong> intertidal area. Project operation wouldprobably occur with <strong>the</strong> refilling of <strong>the</strong> lake <strong>the</strong> same year as <strong>the</strong>drawdown. It would be impossible at this time to insure project startupwould occur in an even year.4. That <strong>the</strong> timing of proposed construction activities in or on <strong>the</strong>banks of Allison Creek be coordinated with <strong>the</strong> FWS, NMFS, <strong>and</strong> <strong>the</strong> ADF&G.Response: This recommendation will be included in <strong>the</strong> stipulations to<strong>the</strong> contractor.5. That streambanks be restored to preproject integrity during <strong>the</strong>construction season in which <strong>the</strong>y are damaged <strong>and</strong> debris or vegetation bekept out of streams.Response:Refer to response to number four.6. That any structures placed in or across streams be removed during <strong>the</strong>same construction season.Response:Refer to response to number four.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!