12.07.2015 Views

Electrical Power for Valdez and the Copper River Basin-1981

Electrical Power for Valdez and the Copper River Basin-1981

Electrical Power for Valdez and the Copper River Basin-1981

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

TABLE D-lSUMMARY COST ESTIMATEOCTOBER 1980 PRICE LEVELVALDEZ HYDROELECTRIC PROJECTALTERNATE POWERHOUSE SITE NO.1AccountNumber010407193031ItemMOBILIZATION AND PREPARATORY WORKLANDS AND DAMAGESINTAKE WORKS AND PENSTOCKPOWERPLANT<strong>Power</strong>houseTurbines <strong>and</strong> GeneratorsAccessory <strong>Electrical</strong> <strong>and</strong> <strong>Power</strong>plant EquipmentTailraceSwitchyardTransmission FacilitiesBUILDINGS, GROlJNDS, AND UTILITIESSUBTOTAL20% CONTINGENCIESCONTRACT COSTENGBIEE~INGAND DESIGNSUPERVISION AND ADMINISTRATIONTOTAL PROJECT COSTFeatureCost( ~ 1 ,000 )1 ,56070020, 07 44,00927026,6135,32331 ,9352,5552,75937,2500-5

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!