Electrical Power for Valdez and the Copper River Basin-1981

Electrical Power for Valdez and the Copper River Basin-1981

Electrical Power for Valdez and the Copper River Basin-1981

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

TABLE 0-3 (cont)Cost Un it TotalAccount Cost CostNumber Description or Item Unit Qu ant i ty ilL ($1,000 )07.6 TAILRACE CHANNELOverburden Excavation CY 48 10 0.5Rock Excavation CY 20 25 0.5Concrete CY 38 300 11.4Rein<strong>for</strong>cement LB 1,900 0.75 1.4R i prap CY 30 30 0.9Steel Pipe LB 40,040 2.25 90. 1Misc. Steel LB 4,004 2.50 10Stop1ogs EA 2 7,000 14TOTAL - TAILRACE CHANNEL 128.807.7 TRANSMISSION LINE(WITH INSPECTION ACCESS TRAIL)Clearing AC 37 2,500 92.5Line Conductors & MILE 3 65,000 195Single Wood PoleStructures (55 pcs)TOTAL - TRANSMISSION LINE 287.519 BUILDINGS, GROUNDS, AND UTILITIESMaintenance Equipment& SupplyStorage Warehouse LS 250,000 250Water Supply System &Fish FacilitiesWater Pump System LS 20,000 20TOTAL - BUILDINGS, GROUNDS, AND UTILITIES 270SUBTOTAL - CONSTRUCTION COSTS 26,61320% CONTINGENCIES 5,323TOTAL - CONTRACT COSTS 31,93630 ENGINEERING AND DESIGN (8%) 2,55531 SUPERVISION AND ADMINISTRATION (8% ) 2,759TOTAL - PROJECT COST 37,250 .0-10

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!