Electrical Power for Valdez and the Copper River Basin-1981

Electrical Power for Valdez and the Copper River Basin-1981

Electrical Power for Valdez and the Copper River Basin-1981

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Table VIII-8Average Rate Determination<strong>Valdez</strong>/G1enna11p.n SystemPressure Reducing TurbineYearNeed*(Table VII-I)(GHW)ProjectCapabili ty(GWH)80% Plant Fac.ProjectOutput(GHW)PresentWorth Factor(@ 8%; 50 yrs)1st Year AnnualEnergy Equivalent(GWH) .VIN1980<strong>1981</strong>19821983198419851986198719881989199019911992199319941995199619971998199920002001..;..2012Annual Energy47.916.430.933.435.138.942.846.950.154.559.063.768.573.6107.45656565656565656565656565656565656565633.435.138.942.846.950.154.5565656565656565656565656= Capital Recovery Factor X Sum of Yearly Energies= .081742 X 557.5 = 49.5 GWH per YearAverage Rate =Annual Cost=$1,365,000 = 2.8¢/kWhAnnual Energy 49.5.9259.8573.7938.7350.6806.6302.58356.0514**30.9330.0930.8831.4631.9231.5731.80338.88557.50* After Solomon Gulch output is subtracted from <strong>for</strong>ecast - includes losses.** Present worth factor <strong>for</strong> 1990-2012.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!