12.07.2015 Views

Electrical Power for Valdez and the Copper River Basin-1981

Electrical Power for Valdez and the Copper River Basin-1981

Electrical Power for Valdez and the Copper River Basin-1981

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

CHAPTER IIIPOWER MARKET DESCRIPTION AND OUTLOOKLocation<strong>Valdez</strong>, situated in <strong>the</strong> nor<strong>the</strong>ast corner of Prince William Sound, is now~~ll known as <strong>the</strong> sou<strong>the</strong>rn·· termim,ls of <strong>the</strong> Alaska oil pipeline. It isals~ . <strong>the</strong>·sou<strong>the</strong>rn termin~s of <strong>the</strong> Richardson highway, which leads toFairbanks, 363 miles·north. Anchorage is 306 miles by road from <strong>Valdez</strong>.The Alaska Marine Highway connects <strong>Valdez</strong> to Whittier <strong>and</strong> Cordova. Itis served by air, but not mainline schedules.Glennallen, about half way between <strong>Valdez</strong> <strong>and</strong> Fairbanks, is 115 milesnorth on <strong>the</strong> Richardson highway. It is <strong>the</strong> eastern end of <strong>the</strong> Glennhighway, 189 miles from Anchorage.Figure 111-1 locates <strong>Valdez</strong> <strong>and</strong> Glennallen geographically.Economy<strong>Valdez</strong> economy be<strong>for</strong>e <strong>the</strong> oil pipeline was based on fishing <strong>and</strong> government.Be<strong>for</strong>e <strong>the</strong> 1964 earthquake, shipping played a part. The pipelineactivity has had heavy impact since 1970 when <strong>the</strong> first pipe stockpilingstarted. Oil storage <strong>and</strong> shipping facilities have been operating in<strong>Valdez</strong> since <strong>the</strong> middle of 1977. Stability is returning after <strong>the</strong>extreme economic <strong>and</strong> demographic fluctuations caused by pipeline constructionbetween 1974 <strong>and</strong> 1976, <strong>and</strong> construction "wind-down" in late1976 <strong>and</strong> early 1977. The following chronology summarizes economicactivity in <strong>Valdez</strong> since 1970:1970 - Beginning of pipe delivery to <strong>Valdez</strong> <strong>and</strong> o<strong>the</strong>r areas along<strong>the</strong> pipeline corridor.1971 - Value of pipe dropped off but delivery of pipe continued.1972 <strong>and</strong> 1973 - No pipe delivered in this period. Business receiptsdecreased by SO percent in 1972 <strong>and</strong> continued to decrease in 1973.1974 to 1976 - Pipe delivery resumes with seven-fold increase by1975. Community experiences an ll-fold increase in businessreceipts from 1974 to 1975 <strong>and</strong> a four-fold increase from 1975 to1976.1976 - Peak of pipeline terminal construction. Pipe delivery eighttimes less than 1975 activity.1977 - Operation of pipeline <strong>and</strong> terminal began in late summer.CVEA service of some pump station utility type loads commenced.Since 1977, <strong>Valdez</strong> economy, judged by employment, dipped <strong>for</strong> severalmonths after pipeline operation commenced, <strong>the</strong>n recovered with cyclic7

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!