12.07.2015 Views

Electrical Power for Valdez and the Copper River Basin-1981

Electrical Power for Valdez and the Copper River Basin-1981

Electrical Power for Valdez and the Copper River Basin-1981

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Technical services such as electronic systems maintenance <strong>and</strong> repair,meter relay mechanics. <strong>and</strong> staff <strong>for</strong> major maintenance activities wouldbe provided on an as needed basis by utility personnel supplemented bystaff from APA headquarters <strong>and</strong> from <strong>the</strong> Eklutna <strong>and</strong> Snettishamhydroelectric projects. This amounts to sharing <strong>the</strong> skills of <strong>the</strong> staffsof several small projects in order to minimize total operation <strong>and</strong>maintenance costs.Transmission line maintenance <strong>and</strong> major powerplant maintenance, suchas turbine overhaul. would require additional manpower provided ei<strong>the</strong>r by<strong>the</strong> utility staff or personnel detailed from o<strong>the</strong>r APA projects.The project benefits are attributable to power <strong>and</strong> <strong>the</strong> utilization ofo<strong>the</strong>rwise unemployed labor resources. All project costs would be repaid\/ith interest through revenues derived from <strong>the</strong> sale of project power.39

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!