TABLE IV-1HISTORICAL LOADS--VALDEZ AND GLENNALLENVALDEZ GLENNALLEN TOTAL eVEA VALDEZYEAR RESI C/I TOTAL RESI C/I TOTAL RESI e/I TOTAL INDUSTRIALENERGY (MWH)1970 1,200 3,800 5,912 900 3,200 4,790 2,134 7,072 10,7021971 1,483 4,010 6,363 1,128 3,447 5,363 2,610 7,457 11,7261972 1,500 3,800 6,202* 1,300 3,400 5,601* 2,796 7,173 11,8031973 1,500 4,200 6,470 1,400 3,700 6,121 2,887 7,942 12,5911974 2,110 6,176 9,457 1,641 3,802 6,167 3,751 9,979 15,6241975 4,966 10,894 18,251 2,690 4,692 8,636 7,656 15,586 26,8871976 6,966 14,353 26,006 3,269 7,570 13,281 10,235 21,923 39,2871977 7,589 15,330 26,060 3,306 15,287 21,401 10,895 30,617 47,461 39,4201978 6,455 14,222 23,411 3,090 13,738 20,425 9,545 27,960 43,835 54,7501979 6,393 14,153 22,977 2,961 12,027 18,522 9,354 26,181 41,499I-'wPEAK DEMAND (kW)1970 1,160 1,030 2,1901971 1,266 1,060 2,3261972 1,270* 1,130* 2,400*1973 1,280 1,220 2,5001974 2,470 1,340 3,8101975 4,750 2,360 7,1101976 4,875 3,500 8,3751977 4,850* 4,290* 9,140 38,560 (capacity1978 4,750 4,000 8,750 40,000 (capacity1979 4,225 3,470 7,695CUSTOMERS1970 N/A N/A N/A N/A N/A N/A 542 219 7861971 348 107 467 329 117 464 677 224 9311972 N/A N/A N/A N/A N/A N/A 651 235 9181973 N/A N/A N/A N/A N/A N/A 680 245 9571974 494 178 685 413 137 575 907 315 1,2601975 637 209 860 531 150 708 1,168 359 1,5681976 1,052 231 1,297 621 171 823 1,673 402 2,1631977 1,040 222 1,276 651 203 887 1,691 425 2,1631978 892 229 1,140 666 194 894 1,558 423 2,0341979 959 217 1,209 629 218 882 1,588 445 2,091* = estimated Alaska <strong>Power</strong> AdministrationApril 1980
TABLE IV-2 Historical Growth Rates (%) <strong>and</strong> Ener~.l Use (kWh/customer)VALDEZ GLENNALLEN TOTAL eVE AYear Resi C/I Total Resi C/I Total Resi C/I TotalENERGY GROWTH RATES (%)1971 23.6 5.5 7.6 25.3 7.7 12.0 22.3 5.4 9.61972 1.1 -5.2 -2.5 15.2 -1.4 4.4 7.1 -3.8 0.7 .1973 0 10.5 4.3 7.7 8.8 9.3 3.3 10.7 6.71974 40.7 47.0 46.2 17.2 2.8 0.8 29.9 25.6 24.11975 135.4 76.4 93.0 63.9 23.4 40.0 104.1 56.2 72.11976 40.3 31.8 42.5 21.5 61.3 53.8 33.7 40.7 46.11977 8.9 6.8 -0.1. 1.1 101.9 61.1 6.4 39.7 20.81978 -14.9 -7.2 -9.9 -6.5 -10.1 -4.6 . ...,.12.4 -8.7 -7.61979 -1.0 -0.5 -1.9 -4.2 -12.5 -9.3 -2.0 -6.4 -5.31970-1973 7.7 3.4 3.1 15.9 5.0 8.5 10.6 3.9 5.61973-1977 50.0 38.2 41.6 24.0 42.6 36.7 39.4 40.1 39.3CUSTOMER GROWTH RATES (%-)1971 24.9 2.3 18.41972 12.4* 18.5* 13.6* 7.9* 5.4* 7.4* -3.8 4.9 . -1.4~ 1973 12.4* 18.5* 13.6* 7.9* 5.4* 7.4* 4.5 4.3 4.2.p..1974 12.4* 18.5* 13.6* 7.9* 5.4* 7.4* 33.4 28.6 31.71975 28.9 17.4 25.5 28.6 9.5 23.1 28.8 14.0 24.41976 65.1 10.5 50.8 16.9 14.0 16.2 43.2 12.0 35.21977 -1.1 -3.9 -0.8 4.8 18.7 7.8 1.1 5.7 2.51978 -14.2 3.2 -U.4 2.3 -4.4 0.8 -7.9 -0.5 -6.41979 7.5 -5.2 6.1 -5.6 12.4 -1.3 1.9 5.2 2.8ENERGY USE (kWh/CUSTOMER)1970 N/A N/A N/A N/A N/A N/A 3,937 32,292 13,6161971 4,261 37,477 13,625 3,429 29,462 11,558 3,855 33,290 12,5951972 N/A N/A N/A N/A N/A N/A 4,295 30,523 12,8571973 N/A N/A N/A N/A N/A N/A 4,246 32,416 13,1571974 4,271 34,697 13,806 3,973 27,752 10,725 4,136 31,679 12,4001975 7,796 52,124 21,222 5,066 31,280 12,198 6,555 43,415 17,1471976 6,622 62,134 20,051 5,264 44,269 16,137 6,118 54,535 18,5321977 7,297 69,054 20,367 5,078 75,305 24,126 6,443 72,040 21,9421978 7,237 62,105 20,546 4,640 70,814 22,832 6,126 66,099 21,5511979 6,666 65,221 19,005 4,708 55,170 21,000 5,890 58,834 19,8471978 7,237 62,105 20,546 4,640 70,814 22,832 6,126 66,099 21,551* Average annual from 19JL to 1974 Alaska <strong>Power</strong> AdministrationApril 1980
- Page 1 and 2:
E---~for-~-~and the Copper River B-
- Page 3:
SYLLABUSThe geographic area conside
- Page 6 and 7:
SOUTHCENTRAL RAILBELT AREA. ALASKAI
- Page 8 and 9:
INTRODUCTIONDue to continued growth
- Page 10 and 11:
The city of Valdez conducted enviro
- Page 12 and 13:
FIGURE I:HYDROPOWER STUDY AREAFOR V
- Page 14 and 15:
oard feet of hardwoods, half of whi
- Page 16 and 17:
VALDEZ
- Page 18 and 19:
ALYESKA PIPELINE TERMINAL
- Page 20 and 21:
Other Activities:Nonseasonal stable
- Page 22 and 23:
Table 3Historical Population of Val
- Page 24 and 25:
Transportation and Tourism:Detailed
- Page 26 and 27:
The following tables show the futur
- Page 28 and 29:
framework of the study authority an
- Page 30 and 31:
Nucl ear:Nuclear energy development
- Page 32 and 33:
lntertie:With the deciSlon by the C
- Page 34 and 35:
If the powerhouse were moved to jus
- Page 36 and 37:
CONSERVATION:Description:THE NONSTR
- Page 38 and 39:
TRANSMISSION INTERTIEDescription_:T
- Page 40 and 41:
impaired. As a result, standoy gene
- Page 42 and 43:
ALLISON LAKE
- Page 44 and 45:
From the time of pO\'Ier-on-line, o
- Page 46 and 47:
Technical services such as electron
- Page 48 and 49:
175150FIGURE: 2ENERGY DEMAND - REVI
- Page 50 and 51:
175150FIGURE: 4ENERGY - REVISED APA
- Page 52 and 53:
SYSTEMOF ACCOUNTSAccountsPlan AAll
- Page 54 and 55:
AccountsPlan A.All Diesel Generatio
- Page 56 and 57:
then be determined for the 100-year
- Page 58 and 59:
Comnents received from the city of
- Page 60 and 61:
FINALENVIRONMENTAL IMPACT STATEMENT
- Page 62 and 63:
LIST OF PRFPARERSNameExpert i seExp
- Page 64 and 65:
COMPARATIVE IMPACTS OF ALTERNATIVES
- Page 66 and 67:
AREAS OF CONTROVERSYTo date no spec
- Page 68 and 69:
COVER SHEETLIST OF PREPARERSFINAL E
- Page 70 and 71:
A. NEED FOR AND OBJECTIVES OF ACTIO
- Page 72 and 73:
alternative has been estimated to p
- Page 74 and 75:
slopes surrounding Allisorl Lake ar
- Page 76 and 77:
weir to the mouth, with the majorit
- Page 78 and 79:
expected to Allison Creek below All
- Page 80 and 81:
2. Biologicala. Vegetation:,r-.Hydr
- Page 82 and 83:
Waterfowl and water related birds f
- Page 84 and 85:
within the local community. The imp
- Page 86 and 87:
Cumulative impacts to the Port Vald
- Page 88 and 89:
Program-related issues. The Alaska
- Page 90 and 91:
13.10INDEXSubjectsAffected Environm
- Page 92 and 93:
APPENDIX AHYDROLOGYTABLE OF CONTENT
- Page 94 and 95:
snowfields and glacier areas on the
- Page 96 and 97:
AVERAGE MONTHLY PRECIPITATION(inche
- Page 98 and 99:
gages at Lowe River near Valdez, Lo
- Page 100 and 101:
were estimated based on Tonsina Riv
- Page 102 and 103:
'fUR r)c r ,-. n:c JA~ FEEl "'A~ AP
- Page 104 and 105:
--..,I-J--. -,-- - ----- - --TONS I
- Page 106 and 107:
ALLISON CREEKESTIMATED STREAMFLOW -
- Page 108 and 109:
APPENDIX BEXISTING SYSTEM ANDFUTURE
- Page 110 and 111:
IIHf{ODUCTIONThis section is devote
- Page 112 and 113:
FIGURE: B-1PRICE INCREASES OF DIESE
- Page 114 and 115:
Installed Generat.or Peak Energy fo
- Page 116 and 117:
90008000700060005000- 4000 ~..-:300
- Page 118 and 119:
Table 4VALDEZ-GLENNALLEN AREA UTILI
- Page 120 and 121:
As footnoted, the Alaska Power Admi
- Page 122 and 123:
201510CDI5.: ...:.T. .' !', ~. '.,
- Page 124 and 125:
SOLOMON HY I.IICU'-__'lOUIE 1-7 MlN
- Page 126 and 127:
, .. ,·.AYI.AG! fOWl. DlMANO WHit,
- Page 128 and 129:
The following is an excerpt from th
- Page 130 and 131:
Power Requirement Study (excerpt)GL
- Page 132 and 133:
APPENDIX CECONOMIC EVALUATION
- Page 134 and 135:
INTRODUCTIONThe purpose of this sec
- Page 136 and 137:
value of 66.92 mills/kWh. This figu
- Page 138 and 139:
FIGURE C-2: SOLOMON GULCH ALLISON L
- Page 140 and 141:
Er.Jployment Benefits Computation (
- Page 142 and 143:
energy would be fully utilized. As
- Page 144 and 145:
ECONOMIC EVALUATION OF HYDROPONER M
- Page 146 and 147:
ECONOMIC EV~LUATION OF HYDROPO~ER M
- Page 148 and 149:
------~-~ECONO~IC EVALUATION OF HYD
- Page 150 and 151:
ECONOMIC EVALUATION OF HYDROPO~ER M
- Page 152 and 153:
ECONO~IC EVALUATION OF HYDROPOwER M
- Page 154 and 155:
APPENDI X DPROJECT DESCRIPTION AND
- Page 156 and 157:
POWERHOUSETypeTRANSMISSION LINEVolt
- Page 158 and 159:
POWERHOUSETypeTRANSMISSION LINEVolt
- Page 160 and 161:
VALDEZ HYDROELECTRIC POWER PROJECTG
- Page 162 and 163:
turbine. The penstock would bifurca
- Page 164 and 165:
TABLE D-lSUMMARY COST ESTIMATEOCTOB
- Page 166 and 167:
TABLE 0-3DETAILED COST ESTIMATEVALD
- Page 168 and 169:
TABLE D- 3 (cont)Cost Unit Tota 1Ac
- Page 170 and 171:
TABL E D-4DETAILED COST ESTIMATEVAL
- Page 172 and 173:
TABLE D-4 (cont)Co st Unit Tota 1Ac
- Page 174 and 175:
, ..... ,..\ (I),;> "----f .'-.. -I
- Page 176 and 177:
"'~~TAPANDROCK TRAP1600.•. -~ "00
- Page 178 and 179:
CORPS OF ENGINEERSU. S. ARMY./f----
- Page 180 and 181:
APPENDIX EENVIRONMENTAL DATA
- Page 182 and 183:
TABLE 1ATEMPERATURE RECORDING OF AL
- Page 184 and 185:
TABLE 1A (cont)ALL! SON CREEK (cont
- Page 186 and 187:
TABLE 1A (cont)ALLISON CREEK (cont)
- Page 188 and 189:
ALLISON CREEK (cont)FEBRUARY HIGH L
- Page 190 and 191:
ALLISON CREEK (cant)TABLE lA (cant)
- Page 192 and 193:
TABLE 1A (cont)ALLISON CREEK (cont)
- Page 194 and 195:
TABLE 1A (cont)SOLOMON CREEK - HIGH
- Page 196 and 197:
TABLE 1A (cant)SOLOMON CREEK (cant)
- Page 198 and 199:
TABLE 1A (cont)SOLOMON CREEK (cont)
- Page 200 and 201:
TABLE lA (cont)SOLOMON CREEK (cont)
- Page 202 and 203:
TABLE 1A (cont)SOLOMON CREEK (cont)
- Page 204 and 205:
SOLOMON CREEK (cont)TABLE 1A (cont)
- Page 206 and 207:
TABLE 2ACalculated Flows of Allison
- Page 208 and 209:
TABLE 2BCalculated Flows of Allison
- Page 210 and 211:
TABLE 4AWater Quality Data of Allis
- Page 212 and 213:
TABLE 4A (cont)PARAMETERCalciumMagn
- Page 214 and 215:
TABLE 4A (cont)PARAMETERTurb i d it
- Page 216 and 217:
TABLE 4A (cont)PARAMETERTurb i d it
- Page 218 and 219:
TABLE 4BALLISON LAKEWA TER QUALI TV
- Page 220 and 221:
TABLE 6BIRDS OF THE PORT VALDEZ ARE
- Page 222 and 223:
Oregon JuncoTree SparrowWhite-crown
- Page 224 and 225:
UNITED STf-lrESDEPARTMENT OF THE IN
- Page 226 and 227:
c. Effects on Benthos: The proposed
- Page 228 and 229:
An ecological evalu~)tion as requir
- Page 230 and 231:
JAY S. HAMMO~D. GOVERNORDEPARTMENr
- Page 232 and 233:
CULTURAL RESOURCESAboriginal Settin
- Page 234 and 235:
shorp--probablv to facilitate easie
- Page 236 and 237:
Today the Alyeska oil terminal enco
- Page 238 and 239:
APPENDIX GFOUNDATIONS AND MATERIALS
- Page 240 and 241:
100 psi pressure at depth. The sour
- Page 242 and 243:
-1'~~ ·/~-IU-'J\·-----'~r-.-;-,~
- Page 244 and 245:
~UMi'.'j~'~Y!lfGIOL~ N ..--Pa.w'rln
- Page 246 and 247:
; ;; Ii; Z II;;; II til, ;;; : i;;
- Page 248 and 249:
Valdez InterimSouthcentral Railbelt
- Page 250 and 251:
LIST OF FIGURES AND TABLESPageFigur
- Page 252 and 253:
-----------------------------------
- Page 254 and 255:
-~~ ~..rt~i~;Valdez Interim ReportS
- Page 256 and 257:
alder, salmonberry, blueberry, and
- Page 258 and 259:
Table IIPrince William Sound Salmon
- Page 260 and 261:
3/ 4/ 5/- - -1976 Average weights b
- Page 262 and 263:
the number of pink salmon counted i
- Page 264 and 265: in the fall at the upper end of the
- Page 266 and 267: Table 1 VAllison Creek -Discharge M
- Page 268 and 269: outlet from the lake; however, the
- Page 270 and 271: As stated previously, two alternati
- Page 272 and 273: Discharge measurements are sparse a
- Page 274 and 275: Streambed sedimentation can be caus
- Page 276 and 277: 8. That during the construction pha
- Page 278 and 279: LITERATURE CITEDBailey, Jack E., an
- Page 280 and 281: Sharp-shinned hawk - Accipiter stri
- Page 282 and 283: Allison ereekTemperature DataDateTe
- Page 284 and 285: ALLISON CREEKSeptember 1979 . Octob
- Page 286 and 287: ALLISON CREEKDecember 1979 Januarl
- Page 288 and 289: SOLOMON. CREEKSeEtember 1979 Octobe
- Page 290 and 291: 7. That clearing for the penstock c
- Page 292 and 293: 22. That a cooperative study of the
- Page 294 and 295: APPENDIX IMARKETABILITY REPORT
- Page 296 and 297: Department Of EnergyAlaska Power Ad
- Page 298 and 299: Valdez/Glennallen Power Market Anal
- Page 300 and 301: List of·Tab1esTableIII-1IV-1IV-2V-
- Page 302 and 303: Valdez/Glennallen Power Market Anal
- Page 304 and 305: CHAPTER IISUMMARYValdez and Glennal
- Page 306 and 307: A. Assuming Allison Creek follows S
- Page 308 and 309: CHAPTER IIIPOWER MARKET DESCRIPTION
- Page 310 and 311: increases. Municipal construction h
- Page 312 and 313: CHAPTER IVEXISTING POWER SYSTEMSSys
- Page 316 and 317: Load FactorsThe following chart lis
- Page 318 and 319: CHAPTER VFUTURE POWER AND ENERGY AS
- Page 320 and 321: Table V-IVALDEZ/GLENNALLEN AREA UTI
- Page 322 and 323: Table V-2INSTALLED CAPACITY REQUIRE
- Page 324 and 325: CHAPTER VI .ALTERNATIVE GENERATION
- Page 326 and 327: Biomass-FiredAlthough of many forms
- Page 328 and 329: A Solomon Gulch article in the Dece
- Page 330 and 331: Net EnergyThis section discusses th
- Page 332 and 333: Table VII-2Valdez/Glennallen Foreca
- Page 334 and 335: 40VALDEZ/GLENNALLENCAPACITY/RESOURC
- Page 336 and 337: 150Figure VII-3140VALDEZ/GLENNALLEN
- Page 338 and 339: 150·Figure VII-5140VALDEZ/GLENNALL
- Page 340 and 341: TABLE VIII-IASummary Cost EstimateO
- Page 342 and 343: TABLE VIII-2Summary Cost EstimatePr
- Page 344 and 345: Table VIII-3AAverage Rate Determina
- Page 346 and 347: Table VIII-4CVEA Diesel Generation
- Page 348 and 349: Table VIII-5Average Rate Comparison
- Page 350 and 351: Table VIII-6Average Rate Determinat
- Page 352 and 353: Table VIII-8Average Rate Determinat
- Page 354 and 355: Table VIII-IOAverage Rate Determina
- Page 356 and 357: ----~------T'lble VIII-J 1Average R
- Page 358 and 359: CHAPTER IXBIBLIOGRAPHY1. Power Cost
- Page 360 and 361: : I,B'III Ii ::1: iii,APPENDIX JPUB
- Page 362 and 363: Recipents of Valdez Draft Interim f
- Page 364 and 365:
u. s. ENVIRONMENTAL PROTECTION AGEN
- Page 366 and 367:
25. ~e str?ngly recOTmend that an a
- Page 368 and 369:
UNITED STATES DEPARTMENT OF CO!'!ME
- Page 370 and 371:
3. have adequate flows for flushing
- Page 372 and 373:
Cnitc:d Srat6 [)c'~,artmcnt of the:
- Page 374 and 375:
AdvisoryCouncil OnHistoricPreservat
- Page 376 and 377:
Corps Of Engineers - 2 -11/4/80Than
- Page 378 and 379:
-2-'2. Most of the State 1 and enco
- Page 380 and 381:
-~-The SCH has no objection to this
- Page 382:
ALASKA POWER AUTHORITY333 WEST 4th