12.07.2015 Views

Electrical Power for Valdez and the Copper River Basin-1981

Electrical Power for Valdez and the Copper River Basin-1981

Electrical Power for Valdez and the Copper River Basin-1981

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

-~-The SCH has no objection to this proposal; however, DF&G an~ DNR havespecific concerns which should be addressed as fur<strong>the</strong>r studles areconducted. we would like to rec:orrmend that <strong>the</strong> COE coordinates futurestudies <strong>and</strong> planning with DNR <strong>and</strong> DF&G prior to completion of <strong>the</strong> FinalEnvironmental Impact Statement (FEIS).when <strong>the</strong> FEIS is submitted to <strong>the</strong> SCH, it will be placed in review <strong>for</strong>consistency with <strong>the</strong> Alaskan Coastal Management Program (ACMP) <strong>and</strong> <strong>for</strong>final A-95 review.Thank you <strong>for</strong> your cooperation with <strong>the</strong> review process. 1.cc:Commissioner Skoog, DF&GTorn Barnes, OCMRob Ridgway, City of <strong>Valdez</strong>L.A. Dutton, DNRBruce Barrett, DF&GSincerely, 1J,~kL~Mi\hael Whitehead .State-Federal Coordinator9. Tne Corps will work closely with <strong>the</strong> Departments of Fish an: ~ame <strong>and</strong>Natural Resources during <strong>the</strong> Aovancea Engineering <strong>and</strong> Desi~' ~hase of <strong>the</strong>Project. At tnat point <strong>the</strong> specific detailed studies neces!!py will be.conoucted to refine <strong>the</strong> project design <strong>and</strong> mitigative plan.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!