12.07.2015 Views

Electrical Power for Valdez and the Copper River Basin-1981

Electrical Power for Valdez and the Copper River Basin-1981

Electrical Power for Valdez and the Copper River Basin-1981

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

AccountsAll Diesel Generation(Without Condition)Diesel & PRT1984niesel & Hydro1990PRT & Hydr1984 19904. Regional Development(RD)a. Beneficial ImpactsAdditional <strong>Power</strong>ProductionThe cost of additionalenergy will continueto rise with fuel prices.This would have a stiflingeffect on <strong>the</strong> developmentof <strong>the</strong> area.Additional powershould stabilize <strong>and</strong>lower enerqy costsat least 15 years.This should encourage<strong>the</strong> developmentof <strong>the</strong> region.Same as B except <strong>the</strong>total energy is not asgreat; however, thiswould have a muchlonger term effectthan <strong>the</strong> PRT.Same as B<strong>and</strong>C.EmploymentAny change in employmentwould be limited tomaintaining additionaldiesel units.A temporary increasein employment duringconstruction with asmaller permanentincrease <strong>for</strong> operation.Same as B except <strong>the</strong>construction work <strong>for</strong>cewould be much greater<strong>and</strong> <strong>the</strong> duration ofconstruction is muchlonger.Same as B<strong>and</strong>Cb. Adverse ImpactsTax RevenuesNo ChanqeNo ChangeNo ChangeNo ChangePublic ServicesNo ChangeNo ChangeNo ChangeNo Change

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!