12.07.2015 Views

Electrical Power for Valdez and the Copper River Basin-1981

Electrical Power for Valdez and the Copper River Basin-1981

Electrical Power for Valdez and the Copper River Basin-1981

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Valdez</strong> InterimSouthcentral Railbelt StudyAllison Lake Hydropower ProjectAlaskaFinal Fish <strong>and</strong> Wildlife Coordination Act ReportSubmitted to Alaska DistrictU.S. Army, Corps of Engineers·Anchorage, AlaskaPrepared by:Western Alaska Ecological Services Field OfficeU.S. Fish <strong>and</strong> Wildlife ServiceAnchorage, AlaskaMay 1980

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!