Electrical Power for Valdez and the Copper River Basin-1981

Electrical Power for Valdez and the Copper River Basin-1981

Electrical Power for Valdez and the Copper River Basin-1981

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

COMMEIHSPermeability of <strong>the</strong> glacial till <strong>and</strong> <strong>the</strong> artesion water will have to beassessed after additional drilling <strong>and</strong> e~ploration~ to determine <strong>the</strong> extent of<strong>and</strong> solution to <strong>the</strong> problem.ADDITIONAL WORKDue to preliminary nature of <strong>the</strong> work per<strong>for</strong>med to date, additionaldrilling <strong>and</strong> regional <strong>and</strong> local mapping will have to be done during <strong>the</strong>General Design Memor<strong>and</strong>um phase. The particular questions to be addressedwi 11 be:a. Condition <strong>and</strong> permeability of bedrock on proposed tunnel alinements <strong>for</strong>lining requirements.b. Depth <strong>and</strong> permeability of tills.c. Source of artesian water in lake tap area.G-3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!