Table VIII-6Average Rate DeterminationValdp.z/Glennallen SystemAllison Creek Hydro Project - Alternative 1V10Need* Project Project Present 1st Year AnnualYear (Table VII-I) Capabilit~ Output Worth Factor Energ~ Eg,uivalent(GWH) (GWH) Firm (GWH)(@ 8%; 50 yrs)(GWH)1980 47.9<strong>1981</strong> 16.41982 30.91983 33.41984 35.11985 38.9 16** 16.961515.381986 42.8 34~3 34.31987 46.9 34.3 34.31988 50.1 34.3 34.31989 54.5 34.3 34.31990 59.0 34.3 34.31991 63.7 34.3 34.31992 68.5 34.3 34.31993 73.6 34.3 34.31994 34.3 34.31995 34.3 34.31996 34.3 34.31997 34.3 34.31998 34.3 34.31999 34.3 34.32000 107.4 34.3 34.32001-2035 34.3 annually 34.3 11.3076***Annual Energy= Capital Recovery Factor X Sum of Yearly Energies= .081742 X 403.2 = 33.0 GWH per YearAnnual CostAverage Rate = Annua1 Energy$3.489.521 = 10.6¢/kWh33.0* After Solomon Gulch output is subtracted from <strong>for</strong>ecast - includes losses.** Assumed output <strong>for</strong> last half of year.*** Present worth factor <strong>for</strong> 1986-2035.387.85403.2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!