12.07.2015 Views

Electrical Power for Valdez and the Copper River Basin-1981

Electrical Power for Valdez and the Copper River Basin-1981

Electrical Power for Valdez and the Copper River Basin-1981

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

JA r s. HAIIIIOIilD. 60YfRIIOIINovember 4, 1980Col. Lee R. NunnDistrict Engineer'Alaska uistrict, Corps of EngineersPost Office Box 7002Anchorage, Alaska 99510Dear Colonel Nunn:Re:<strong>Electrical</strong> <strong>Power</strong> <strong>for</strong> <strong>Valdez</strong> - Draft Feasibility Report <strong>and</strong>Environmental Impact StatementThe Alaska Department of Fish <strong>and</strong> Game has reviewed <strong>the</strong> referenced draftfeasibility report <strong>and</strong> Environmental Impact Statement (EIS).In general. we feel <strong>the</strong> report <strong>and</strong> EIS provide an adequate descriptionof <strong>the</strong> proposed project, potential environme'1tal impacts <strong>and</strong> mitigationmeasures.1. Our biggest concern re1~tes to <strong>the</strong> potential impacts on <strong>the</strong> anadromousfisheries resources in Allison Creek. While we have no objection to <strong>the</strong>project as proposed this Department will require measures to mitigateconflicts. We support <strong>the</strong> concept of <strong>the</strong> U.S, Fish <strong>and</strong> Wildlife Servicerecommendations; however, we feel <strong>the</strong> additional studies described inboth <strong>the</strong> Coordination Act Report (page 17) <strong>and</strong> <strong>the</strong> EIS (page EIS-16)should be conducted be<strong>for</strong>e any specific recommendation on mitigation ismade. The Department of Fish <strong>and</strong> Game desires to participate in both'<strong>the</strong> scoping <strong>and</strong> actual conduct of <strong>the</strong> studies which should be accom- .plished during <strong>the</strong> advanced engineering <strong>and</strong> design phase of <strong>the</strong> project.~, The ~laska District will be ga<strong>the</strong>ring additional physical <strong>and</strong> bio10 icalln<strong>for</strong>matl0n,durlng <strong>the</strong>,Advanced Engineering <strong>and</strong> Design (AE&D) phase /streamgage on All1son Creek 1S now operational <strong>and</strong> two intergrave1 recordint~erm?grap~s are p~oposed <strong>for</strong> installation in <strong>the</strong> near future. The A~askaD1strlct w11l cont~n~e close coordination of all future studies with yourdep~rtment <strong>and</strong> SOllC1t your recommendations to assure <strong>the</strong> project isenv1ronmenta11yacceptab1e.In addition to <strong>the</strong>se general comments on <strong>the</strong> report <strong>and</strong> EIS we have somespecific input which will be transmitted directly to your staff.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!