TABLE VIII-IASummary Cost EstimateOctober 1980 Price LevelAllison Creek (Lake Tap) Alternate No. 18 MW; 34,300 MWh firm annual energy; 39,350 MWh average annual energy.L<strong>and</strong>s <strong>and</strong> DamagesHydraulic Works<strong>Power</strong>plant, Switchyard, <strong>and</strong>.Transmission System*Miscellaneous (Mobilization, Buildings, etc.)Contingencies (20%)Engineering <strong>and</strong> Design (8%)Supervison <strong>and</strong> Administration (8%)Subtotal - Contract CostInterest During Construction (8% <strong>for</strong> 2 years)Total Investment Cost$ 700,00020,074,0004,009,0001,830,0005,323,0002,555,0002,759,00037,250,0002,980,000$40,230,000or $5,029/kWAverage Annual Cost (8% <strong>for</strong> 50 years)=Total Investment x 0.081743Operation, Maintenance, <strong>and</strong> ReplacementTotal Average Annual Cost3,288,521201,000$ 3,489,521=10.2¢/kWh (firm)* Allison Creek powerplant to Solomon Gulch transmission line tap; 3 miles.40

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!