12.07.2015 Views

Electrical Power for Valdez and the Copper River Basin-1981

Electrical Power for Valdez and the Copper River Basin-1981

Electrical Power for Valdez and the Copper River Basin-1981

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

15. That <strong>the</strong> CE collect intragravel temperature data of Allison Creekcontinuously <strong>for</strong> at least one year, beginning as soon as possible.Response: Intragravel temperature data will be collected during <strong>the</strong>advanced engineering <strong>and</strong> design phase.16. That <strong>the</strong> CE take temperature profiles of Allison Lake to <strong>the</strong> laketap depth <strong>and</strong> temperature, dissolved oxygen, turbidity, heavy metal, <strong>and</strong>pH readings at <strong>the</strong> lake surface as well as <strong>the</strong> depth of <strong>the</strong> lake tap.These measurements should be collected as soon as possible. A minimumsampling ef<strong>for</strong>t would include <strong>the</strong> months of March, June, September, <strong>and</strong>December.Response: Refer to response to number 15.17. That <strong>the</strong>.CE collect continuous temperature data below <strong>the</strong> proposedtailrace into Allison Creek <strong>for</strong> at least <strong>the</strong> first year of projectoperation.Response: The <strong>the</strong>rmograph which is now operating in Allison Creek willcontinue to collect data <strong>for</strong> at least <strong>the</strong> first year after projectcompletion.18. That <strong>the</strong> CE determine <strong>the</strong> base flow in Allison Creek expected above<strong>the</strong> powerhouse after project op~ration.Response: Preliminary estimates have been completed <strong>and</strong> are included inthis report. A gage will be installed during AE&D <strong>and</strong> maintained afterproject completion.19. Response: An eagle nest survey will be.conducted prior to anyconstruction associated with <strong>the</strong> project.20. That provisions be included in advanced project planning <strong>for</strong>escapement survey of salmon in Allison Creek by <strong>the</strong> FWS or ADF&G.Response: ADF&G, has indicated <strong>the</strong>y would increase <strong>the</strong>ir ef<strong>for</strong>t onAllison Creek. During AE&D at least one year of intensive an escapementsurvey will be conducted.21. That provisions be made in advanced project planning <strong>for</strong> instreamflow analysis of Allison Creek by <strong>the</strong> FWS to determine optimum flowschedules <strong>and</strong> <strong>the</strong> velocity of supplemental flows to Allison Creek.Response: Provisions <strong>for</strong> flow analysis of Allison Creek will be includedin <strong>the</strong> AE&D phase. Whe<strong>the</strong>r an extensive instream flow analysis isreqUired is not known at this time.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!