12.07.2015 Views

Electrical Power for Valdez and the Copper River Basin-1981

Electrical Power for Valdez and the Copper River Basin-1981

Electrical Power for Valdez and the Copper River Basin-1981

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Table VIII-9Average Rate Determination<strong>Valdez</strong>/Glennallen SystemInterconnection with Rllilbelt System(PIIlmer-Glennallen Transmission Line)8% Discount RateYearNeed*(Table VII-l)(GWH)RequiredFromIntertie(GWll)RIIUbelt**EnergyRate(C/kWh)CostofEnergy$1,000CostofIntertie$1,000TotlllCostAnnually$1,0001st YeltrAnnualCost. Equivalent$1,0001st Year AnnulllEnergy Equivalent(MloIH)V1w1980 47.9<strong>1981</strong> 16.41982 30.91983 33.41984 35.11985 38.91986 42.81987 46.91988 50.11989 54.51990 59.01991 63.71992 68.51993 73.61994 78.41995 84.41996 88.71997 93.11998 97.71999 103.52000 107.438.942.846.950.154.559.063.768.573.678.484.488.793.197 .• 7103.5107.44.3 1,672.7 3,8134.2 1,797.6 3,8134.7 2,204.3 3,8134.4 2,204.4 3,8134.5 2,452.5 3,8134.8 2,832.0 3,8135.3 3,376.1 3.8135.9 4,041.5 3,8135.6 4,121.6 3,813·5.4 4,233.6 3,8135.8 4,895.2 3,8136.4 5,676.8 3,8136.1 5,679.1 3.8136.5 6,350.5 3,8136.2 6,417.0 3,8136.6 7,088.4 3,8135.485.75,610.66,017 .36,017.46.265.56.645.07,189.17,854.57,934.68,046.68,708.29,489.89,492.110,163.510,230.010,901.45,079.44,810.21.,776.74,423.04,264.24,187.54,194.84,243.53,969.33,727.13,734.8. 3,768.53,490.2·3,460.33,224.9.3,182.036,01.8.5.36,6

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!