12.07.2015 Views

Electrical Power for Valdez and the Copper River Basin-1981

Electrical Power for Valdez and the Copper River Basin-1981

Electrical Power for Valdez and the Copper River Basin-1981

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

TABLE 0-4 (cont)Co st Unit TotalAccount Cost CostNumber Description or Item Un it Quant ity ilL ( ~l ,000)04.3 ACCESS AOIT AND STAGING AREAExcavationRock Cy 3, 180 75 238.5Common CY 1 ,360 15 20.4Concrete CY 95 600 57Rein<strong>for</strong>cement LB 4,800 0.75 3.6Excavation (Ad it) rock CY 215 200 43Rockbo lts, 1" X 10 1 EA 130 300 39TOTAL - ACCESS AOIT 401.504.5 POWER TUNNELTunnel Excavation (Rock) Cy 21,763 225 4,896.7Concrete Lining CY 4,889 600 2,933.4Rein<strong>for</strong>cement LB 244,450 0.75 183.3Rock Bolts, l"xlO' EA 8,338 210 1,751.0Portal (Including SecondaryRock Trap, Transition, StaginqArea <strong>and</strong> Haul Road)Rock Excavation Cy 17,014 30 510.4Overburden Cy 150,009 10 1 ,500. 1Concrete CY 172 700 120.4Rein<strong>for</strong>cement LB 11 ,100 0.75 8.3Rock Bolts, 1"x141 EA 90 460 41.4Roc k Bo lt s, 1" x 7 1 EA 130 275 35.7Rails <strong>and</strong> Tracks LF 800 50 40Trestle LS 1 100,000 100TOTAL - POWER TUNNEL 12,120.704.5 PENSTOCKSteel, 48"0 LB 1,063,000 2.50 2,657.5R i n9 Stiffeners, Exp. LB 74,410 3 223.2Anchors, Anchor SupportsCo ncrete Support Piers CY 190 300 57Concrete Anchor Blocks Cy 16 300 4.8TOTAL - PENSTOCK 2,942.507 POWERPLANT07. 1 POWERHOUSEMobilization & Pre- LS 120,000 120paratory WorkExcavation <strong>and</strong> Concrete LS 230,000 230D -12

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!