12.07.2015 Views

Electrical Power for Valdez and the Copper River Basin-1981

Electrical Power for Valdez and the Copper River Basin-1981

Electrical Power for Valdez and the Copper River Basin-1981

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

CHAPTER IXBIBLIOGRAPHY1. <strong>Power</strong> Cost Study, 1980-1993; <strong>Copper</strong> Valley Electric AssociationInc.; January 1980 •2. "Total Housing Units Authorized by Building Permits <strong>and</strong> PublicContractors in Selected Alaska Urban Areas"; Department of Housing <strong>and</strong>Urban Development; 1979.3. <strong>Power</strong> Requirements Study; <strong>Copper</strong> Valley Electric Association, Inc.;March 1979.4. Phase I Technical Memor<strong>and</strong>um, Electric <strong>Power</strong> Needs Assessment;Electric <strong>Power</strong> Work Plan Committee; draft report, March 1979.5. Upper Susitna <strong>River</strong> Project <strong>Power</strong> Market Analysis; Department ofEnergy, Alaska <strong>Power</strong> Administration; March 1979.6. Southcentral Alaska's Economy <strong>and</strong> Population, 1965-2025: A Base Study<strong>and</strong> Projections; a report of <strong>the</strong> Economics Task Force; SouthcentralAlaska Water Resources Study (Level B); Alaska Water Study Committee;February 1979.7. Alaska Labor Force Estimates by Area: revised 1974-1977; AlaskaDepartment of Labor, Research <strong>and</strong> Analysis Division; November 1978.8. Transcript of Proceedings - Report on <strong>Valdez</strong> Hydropower PublicMeeting; Corpos of Engineers; 24 July 1978.9. The Proposed Glennallen-<strong>Valdez</strong> Transmission Line - an Analysis ofAvailable Alternatives; <strong>Copper</strong> Valley Electric Association, Inc. byRobert W. Re<strong>the</strong>r<strong>for</strong>d Associates; May 1978.10. Hydroelectric <strong>Power</strong> <strong>and</strong> Related Purposes <strong>for</strong> <strong>Valdez</strong>, Alaska -Southcentral Railbelt Area, Alaska, Stage II Checkpoint Report; AlaskaDistrict, Corps of Engineers; April 1978.11. Solomon Gulch Project No. 2742 - Alaska: Final Environmental ImpactStatement; Federal Energy Regulatory Commission, Office of Electric<strong>Power</strong> Regulation; March 1978.12. Operation <strong>and</strong> Maintenance Plans <strong>and</strong> Costs - Mahoney Lake, Swan Lake,Lake Grace; Alaska <strong>Power</strong> Administration; February 1978.13. Alaska Regional Enf'.rgy Resources, Planning Project - Phase I:Findings <strong>and</strong> Analysis; volume 1; Alaska Division of Energy <strong>and</strong> <strong>Power</strong>Development, Department of Commerce <strong>and</strong> Economic Development; October1977 •59

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!