Electrical Power for Valdez and the Copper River Basin-1981

Electrical Power for Valdez and the Copper River Basin-1981

Electrical Power for Valdez and the Copper River Basin-1981

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

TABLE D-2SUMMARY COST ESTIMATEOCTOBER 1980 PRICE LEVELVALDEZ HYDROELECTRIC PROJECTALTERNATE POWERHOUSE SITE NO.2AccountNumber010407193031ItemMOBILIZATION AND PREPARATORY WORKLANDS AND DAMAGESINTAKE WORKS AND PENSTOCKPOWERPLANT<strong>Power</strong>houseTurbines <strong>and</strong> GeneratorsAccessory <strong>Electrical</strong> <strong>and</strong> <strong>Power</strong>p 1 an t Equ i pmen tTailraceSwitchyardTransmission FacilitiesBUILDINGS, GROUNDS, AND UTILITIESSUBTOTAL20% CONTINGENCIESCONTRACT COSTENGINEERING AND DESIGNSUPERVISION AND ADMINISTRATIONTOTAL PROJECT COSTFeatureCost( ~1 ,000)1,34072417,5634,62925024,5064,90129,4072,3532,54134,301D-6

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!