12.07.2015 Views

Electrical Power for Valdez and the Copper River Basin-1981

Electrical Power for Valdez and the Copper River Basin-1981

Electrical Power for Valdez and the Copper River Basin-1981

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Table VIII-4CVEA Diesel Generation Expenses - HistoricAnnual EXEenses ($)EXEense Items 1974 1975 1976 1977 1978 1979Production Operationw/o fuel 117,698 284,556 473,161 653,248 778,609 713,288fuel 344,038 695,218 1,069,900 1,479,667 1,363,869 1,733,009Total Production 461,736 979,774 1,543,061 2,132,915 2,142,478 2,506,297OperationProduction Maintenance 33,732 57,370 83,752 102,218 116,088 114,117Total Production O&M 495,469 1,037,144 1,626,813 2,235,133 2,258,566 2,620,414Production Plantin-Service(2,239,181) (3,392,115) (8,025,424) (7,593,779) (7,712,880) (7,718,781)Annual Investment.po.a-Cost (at 7.5% <strong>and</strong>20-year Life) 219,646 332,740 787,231 744,890 756,570 757,150Total Annual Costs 715,115 1,369,884 2,414,044 2,980,023 3,015,136 3,377,564Net Generation (kWh) 15,624,140 26,886,515 39,286,690 47,461,390 ·43,835,350 41,498,633Energy Production Expense Rates (¢/kWh)O&M Excluding Fuel 1.0 1.3 1.4 1.6 2.0 2.1Total O&M Including Fuel 3.2 3.9 4.1 4.7 5.2 6.3Annual Investment Cost 1.4 1.2 2.0 1.6 1.7 1.8Total Annual Cost 4.6 5.1 6.1 6.3 6.9 8.1Note:Preliminary in<strong>for</strong>mation indicates 1980 annual generation cost may be close to 10¢/kWb.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!