12.07.2015 Views

Complete Regional Transportation Plan 2012 - Cape Cod ...

Complete Regional Transportation Plan 2012 - Cape Cod ...

Complete Regional Transportation Plan 2012 - Cape Cod ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

In calculating the backups and delays, the cumulative number of cars that couldnot be accommodated was divided by the bridge capacity to get the maximumtheoretical delay for an average weekday (this is the amount of time required forthe peak demand to dissipate). The results are shown in the following table:TABLE 2 - THEORETICAL DAILY VEHICULAR DELAYS DURING BRIDGE LANE CLOSURESApril OctoberSagamore Bridge Northbound 1.7 hours 4.4 hoursSouthbound 2.4 hours 2.3 hoursBourne Bridge Northbound 0.3 hours 0.4 hoursSouthbound 0.3 hours 1.8 hoursImpacts to traffic will be most severe in the Fall during maintenance on the SagamoreBridge. Encouraging the use of the alternate bridge would be an important element ofany mitigation strategy. Impacts to the areas on bypass routes, (e.g., diversion fromRoute 6 westbound at Exit 2 through Sandwich), will be significant and some planning tominimize these impacts must also be done.Strategies related to Bridge MaintenanceSeveral strategies are suggested for addressing the impacts of maintenance-related laneclosures. In all cases, adequate public notification is recommended. In 2009, the ArmyCorps of Engineers established a website and email notification system for majormaintenance efforts on the bridges. The <strong>Cape</strong> <strong>Cod</strong> Commission is committed toproviding access to updates through the internet traveler information system(www.gocapecod.org). By providing timely warnings of impending closures, travelersmay adjust travel mode, choice of bridge crossing and approach routes, or timing. Thebridges do need to be maintained in order to continue to provide safe passage to andfrom the region. Foul weather may interfere sometimes in the maintenance efforts, andas a result the schedule prolonged. The ACOE seems to now include this aspect inconsideration of the estimated maintenance schedule, and that has provided forimproved public expectations.• Scheduling Maintenance Activities for Off-Peak Periods: minimizes disruptions totraffic during heavy travel periods. The Army Corps is already making efforts to achievethis - and should continue to do so. To the greatest extent possible, lane closures shouldavoid summer months and daytime periods during the spring and fall.• Intelligent <strong>Transportation</strong> Systems (ITS) is collection and dissemination of real-timeinformation through means such as cameras and/or cell phone data collection. Theinformation is available on the state traffic information website and 511 telephonesystem. This allows for travelers to check online or via cell phones on current traffic<strong>Cape</strong> <strong>Cod</strong> <strong>Regional</strong> <strong>Transportation</strong> <strong>Plan</strong> | August 2011Chapter 2.7: <strong>Cape</strong> <strong>Cod</strong> Canal AreaPage 237

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!