Operator Terminal System Manual - 11276916.pdf
Operator Terminal System Manual - 11276916.pdf
Operator Terminal System Manual - 11276916.pdf
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>System</strong> <strong>Manual</strong> – DOP11A <strong>Operator</strong> <strong>Terminal</strong>s<br />
Contents<br />
1 Important Notes................................................................................................. 5<br />
2 Safety Notes ...................................................................................................... 7<br />
3 Unit Information, Installation and Hardware................................................... 9<br />
3.1 Introduction ............................................................................................... 9<br />
3.2 Unit designation, nameplates and scope of delivery............................... 14<br />
3.3 Unit design DOP11A-10.......................................................................... 15<br />
3.4 Unit design DOP11A-20.......................................................................... 16<br />
3.5 Unit design DOP11A-30.......................................................................... 17<br />
3.6 Unit design DOP11A-40.......................................................................... 18<br />
3.7 Unit design DOP11A-50.......................................................................... 19<br />
3.8 Accessories and options ......................................................................... 20<br />
4 Installation ....................................................................................................... 22<br />
4.1 Installation instructions for basic unit ...................................................... 22<br />
4.2 UL compliant installation ......................................................................... 23<br />
4.3 Connection of basic unit DOP11A-10 to DOP11A-50............................. 23<br />
4.4 Connection to a PC................................................................................. 24<br />
4.5 RS-485 connection (DOP11A-10 and DOP11A-30 only)........................ 25<br />
4.6 Connection RS-422 via UWS11A ........................................................... 28<br />
4.7 Connection PFE11A ETHERNET option ................................................ 29<br />
4.8 Connection PFP11A PROFIBUS-DP option ........................................... 30<br />
4.9 Connection to a Siemens S7 via MPI and PCM11A ............................... 31<br />
5 Startup.............................................................................................................. 32<br />
5.1 Initial operation........................................................................................ 32<br />
5.2 <strong>Operator</strong> terminal functions..................................................................... 35<br />
6 Operation and Service .................................................................................... 44<br />
6.1 Project transfer with PC and HMI-Builder ............................................... 44<br />
6.2 Operating display at unit start ................................................................. 48<br />
6.3 Error Messages....................................................................................... 49<br />
6.4 SEW electronics service ......................................................................... 51<br />
7 Programming................................................................................................... 52<br />
7.1 Creating a project.................................................................................... 52<br />
7.2 Communication with MOVIDRIVE ® and MOVITRAC ® 07 ...................... 59<br />
7.3 Programming with the programming software ........................................ 68<br />
7.4 Graphic display and control................................................................... 118<br />
7.5 Text-based display and control ............................................................. 159<br />
7.6 Transferring projects ............................................................................. 163<br />
7.7 Expansion cards for ETHERNET and PROFIBUS-DP ......................... 170<br />
7.8 Index addressing................................................................................... 178<br />
3