SWBTB (2/10) 045 (a)<br />

beds<br />

Co-located Birth Centre:<br />

5 ( including 1 fixed birth<br />

pool but option of portable<br />

birth pools in all birth rooms)<br />

Option 2 0 Delivery Suite: 11<br />

(including 1 birth pool) &<br />

6 triage rooms, 2 High<br />

Dependency beds, 4<br />

recovery beds, 2 Induction<br />

beds<br />

0 42<br />

with ability to<br />

increase by an<br />

additional 4 beds<br />

at peak times<br />

Co-located Birth Centre:<br />

5 ( including 1 fixed birth<br />

pool but option of portable<br />

birth pools in all birth<br />

rooms)11 (& 6 triage rooms<br />

and 2 induction beds) in<br />

Delivery Suite<br />

& 5 in MLU<br />

Option 3<br />

Stand Alone Birth<br />

Centre:<br />

3 ( including 1 fixed birth<br />

pool but option of<br />

portable birth pools in all<br />

birth rooms)<br />

Delivery Suite: 11<br />

(including 1 birth pool) &<br />

6 triage rooms, 2 High<br />

Dependency beds, 4<br />

recovery beds, 2 Induction<br />

beds<br />

0 42<br />

with ability to<br />

increase by an<br />

additional 4 beds<br />

at peak times<br />

Co-located Birth Centre:<br />

5 ( including 1 fixed birth<br />

pool but option of portable<br />

birth pools in all birth rooms)<br />

6.2 Refurbishment Work<br />

All of the short listed options require capital work to improve and expand facilities. Details of the work<br />

required are summarised below.<br />

Table 7: Capital Costs<br />

Do Minimum Option 1 Option 2 Option 3<br />

Expenditure/Funding Item £'000s £'000s £'000s £'000s £'000s £'000s £'000s £'000s £'000s<br />

10/11 11/12 Total 10/11 11/12 Total 10/11 11/12 Total 10/11 11/12 Total<br />

Buildings & Equipment 2,424 932 3,356 1,521 330 1,851 1,521 330 1,851 1,521 330 1,851<br />

Funding<br />

Other Externally Generated Funds - Loan 3,356<br />

<strong>Trust</strong> Capital Programme 1,851 1,851 1,851<br />

A detailed appraisal of capital costs has been undertaken for each option and can be found in<br />

Appendices 1-4. Estimated values and timelines are included within the above table. The key<br />

assumptions are:<br />

Do Minimum: Capital costs are associated with a refurbishment of the <strong>Sandwell</strong> site including a new<br />

build extension to the existing Delivery Suite at <strong>Sandwell</strong> Hospital to provide accommodation to the size<br />

and standard required to meet current standards for a Delivery Suite.<br />

22