SWBTB (2/10) 045 (a)<br />

The final ranking reflects the position having removed the capital charge savings from the trading<br />

position. As this is removed from Options 1,2 and 3 equally then it does not change the overall ranking<br />

assessment.<br />

Table 11: Option Financial Ranking<br />

Options NPV Over Period<br />

Economic<br />

Score<br />

I&E Impact<br />

Over Period<br />

Affordability<br />

Score<br />

Net Movement<br />

over period<br />

£ £ £<br />

I&E Impact<br />

Excl CC<br />

Benefit<br />

Do Minimum (12,416,482) 3 (670,209) 3 (670,209) 3<br />

1 (7,989,616) 1 1,373,789 1 608,165 1<br />

2 (7,989,616) 1 1,373,789 1 608,165 1<br />

3 (8,268,222) 2 1,274,213 2 508,589 2<br />

11. RISK ASSESSMENT AND MANAGEMENT<br />

11.1 Clinical Risks<br />

A sub group of the Project Steering Group identified clinical risks for each of the Do Minimum and Short<br />

Listed (1-3) Options which they then scored, identified mitigation actions and undertook a post mitigation<br />

score. These can be found in appendix 7. These risks and scores were then agreed by the Project<br />

Steering Group.<br />

It should be noted that whilst many risks are common across all of the short listed options a number are<br />

different to reflect the risks specific to each service model. The table below summarises the clinical risk<br />

assessment in terms of risk level.<br />

Table 11: Clinical Risks<br />

Option<br />

Total<br />

No.<br />

of<br />

Risks<br />

Risk Assessment<br />

Post Mitigation Risk<br />

Assessment<br />

Red Amber Green Red Amber Green<br />

12 9 2 1 5 6 1<br />

Do<br />

Minimum<br />

Option 1 7 0 6 1 0 2 5<br />

Option 2 7 0 4 3 0 2 5<br />

Option 3 12 4 7 1 0 5 7<br />

It can be seen that Do Minimum has the highest number of clinical risks assessed as red both before<br />

and after mitigation.<br />

Option 3 is the only other option with red risks pre-mitigation but has no red risks post mitigation<br />

although the highest number and proportion of amber risks post mitigation<br />

28