SWBTB (2/10) 041 (a)<br />

IM&T Strategic Direction – Annual Update to <strong>Trust</strong> <strong>Board</strong><br />

1. Introduction<br />

The purpose of this report is to provide the annual update on the <strong>Trust</strong>’s IM&T strategic<br />

direction and any major risks with the approach. In 2008 a 5 year IM&T strategy (2008-2013)<br />

was produced to steer the <strong>Trust</strong> towards the opening of the new hospital and the associated<br />

plans to have a state-of-the-art hospital enabled by the latest technology, with clinical<br />

professionals delivering their services in a totally paperless environment. The strategy was<br />

subject to annual review.<br />

2. Current IM&T Strategy - 2008-2013<br />

Decisions were made back in 2004, due to the announcement of the National Programme<br />

for IT (NPfIT), that the <strong>Trust</strong> would implement the new solutions for Electronic Patient<br />

Records supplied by NHS Connecting for Health (CfH) and Computer Sciences Corporation<br />

(CSC), the Local Service Provider (LSP). This would include a fully integrated solution<br />

across the Local Health Economy (LHE). These solutions were free to the <strong>Trust</strong>, during<br />

CSC’s contractual lifetime with CfH to deliver the Lorenzo solution set.<br />

Originally back in 2004, the systems had to be fully delivered by <strong>2010</strong>, but a number of<br />

delays have occurred and the delivery timeframe has changed several times. The solutions<br />

were designed to operate within a Data Centre provided by CSC, which removed the need<br />

for management of the systems and associated hardware e.g. servers by local IM&T<br />

departments.<br />

The <strong>Trust</strong> had planned to start moving to Lorenzo in late <strong>2010</strong> or early 2011. This would give<br />

sufficient time to implement EPR functionality to support a paperless hospital in 2016.<br />

Lorenzo Regional Care comprises of 4 major releases to make up a single integrated clinical<br />

solution across the LHE, and broadly comprises of the following:<br />

• Release 1 – Clinic documents, assessments and results reporting<br />

• Release 2 – Requesting of tests and investigations, replacing PAS, outpatient<br />

prescribing, Care Plans and TTO/Discharge process.<br />

• Release 3 – Theatres, Maternity, Inpatient Prescribing and Medicines Administration,<br />

Advanced Bed Management, Multi-Resource Scheduling and integration with social<br />

care messaging.<br />