20.05.2014 Views

Forthbank Wind Energy Development - Partnerships for Renewables

Forthbank Wind Energy Development - Partnerships for Renewables

Forthbank Wind Energy Development - Partnerships for Renewables

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Forthbank</strong> <strong>Wind</strong> <strong>Energy</strong> <strong>Development</strong><br />

Table 8.7a Projected Traffic Flows<br />

Road<br />

Without the proposed wind energy<br />

development<br />

Annual Average<br />

Daily Traffic<br />

Flow<br />

% Heavy Goods<br />

Vehicles<br />

With the proposed wind energy<br />

development<br />

(maximum during construction<br />

phase)<br />

Annual Average<br />

Daily Traffic<br />

Flow<br />

% Heavy Goods<br />

Vehicles<br />

A907 (Clackmannan Road) 18236 11 18286 11<br />

Forth Crescent 679 16 729 21<br />

A907 (Gartarry Roundabout) 15007 11 15057 11<br />

Table 8.7b CRTN Predicted Increase In Day-Time Average Traffic Noise Levels<br />

(L A10,18hour )<br />

Road<br />

Maximum Change in Traffic Noise Level, dB(A)<br />

A907 (Clackmannan Road)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!