<strong>Forthbank</strong> <strong>Wind</strong> <strong>Energy</strong> <strong>Development</strong><br />

Operational Effects<br />

7.7.4 No significant residual effects are anticipated during the operation of the proposed wind energy<br />

development.<br />

De-commissioning Effects<br />

7.7.5 Mitigation measures that will be agreed with the local roads authority prior to de-commissioning<br />

should prevent significant residual effects during this process.<br />

7.8 Summary of Effects<br />

7.8.1 Table 7.6 below summarises the traffic and transport related environmental effects associated<br />

with the proposed wind energy development.<br />

Table 7.6 Summary of Effects<br />

Temporary Potential Effect Mitigation Residual Effect<br />

Construction<br />

Traffic Effects – not significant on the A907 Timing and phasing of deliveries, traffic control Not significant<br />

Traffic Effects – not significant on Forth measures, warning signs, parking restrictions, Not significant<br />

Crescent<br />

escorts <strong>for</strong> abnormal loads<br />

Noise and vibration – potentially significant Timing <strong>for</strong> deliveries and escorts <strong>for</strong> abnormal Not significant<br />

effects on residential area around Forth<br />

Crescent<br />

loads<br />

Dust and dirt – potential significant effects on Road maintenance and cleaning, wheel cleaning Not significant<br />

A907 and Forth Crescent<br />

Air pollution – temporary local air quality Natural dispersion of emissions, vehicle<br />

Not significant<br />

impacts<br />

maintenance<br />

Operation<br />

Not significant None required Not significant<br />

De-commissioning<br />

Potentially significant<br />

Traffic management plan to be agreed with local<br />

roads department prior to de-commissioning<br />

7.8.2 Based upon the traffic flow assessment presented in this chapter it is concluded that:<br />

Not significant<br />

• the effect of construction traffic on the A907 and Forth Crescent would not be<br />

significant;<br />

• noise and vibration effects from construction related traffic would not be significant<br />

on residential properties around Forth Crescent;<br />

• the impact of dust and dirt during construction would not be significant; and<br />

• traffic generated during the de-commissioning would not be significant.<br />

November 2010 Chapter 7 Page 13<br />