20.05.2014 Views

Forthbank Wind Energy Development - Partnerships for Renewables

Forthbank Wind Energy Development - Partnerships for Renewables

Forthbank Wind Energy Development - Partnerships for Renewables

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Forthbank</strong> <strong>Wind</strong> <strong>Energy</strong> <strong>Development</strong><br />

Nr Viewpoint Cumulative<br />

Effect<br />

Cumulative effect<br />

Craigengelt WF<br />

ASDA depot<br />

Greenknowes WF<br />

Earlsburn North<br />

Muirpark<br />

18 Cowie Successive Craigengelt WF<br />

Earlsburn WF<br />

Earlsburn North<br />

Muirpark<br />

Braes of Doune<br />

19 South Alloa Successive Craigengelt WF<br />

Earlsburn WF<br />

Muirpark<br />

20 Clackmannanshire<br />

Bridge<br />

Successive<br />

Earlsburn North<br />

Craigengelt WF<br />

Earlsburn WF<br />

Earlsburn North<br />

Muirpark<br />

Braes of Doune<br />

ASDA depot<br />

21 Cairnpapple Successive Braes of Doune<br />

Craigengelt WF<br />

Earlsburn WF<br />

ASDA depot<br />

Greenknowes WF<br />

Muirpark<br />

Earlsburn North<br />

22 Tomtain Hill Successive Braes of Doune<br />

Craigengelt WF<br />

Earlsburn WF<br />

ASDA depot<br />

Greenknowes WF<br />

Greendykeside<br />

Braiden Hill<br />

Earlsburn North<br />

Pates Hill<br />

Tormywheel<br />

Muirpark<br />

Greengairs<br />

Bracco<br />

Assessed<br />

Magnitude<br />

of Change<br />

Magnitude of<br />

Cumulative<br />

Change<br />

Significance<br />

of Effect<br />

Low Medium Medium<br />

Low Low Low<br />

Low Low Minor<br />

Negligible Negligible Negligible<br />

Negligible High Negligible<br />

Cumulative Sequential Effects<br />

9.5.42 This section below sets out the sequential cumulative visual assessment of views of wind<br />

energy developments potentially obtainable from selected motorways within 20km of the<br />

proposed wind energy development. The study area was determined by the dominating<br />

visibility of the Craigengelt turbines from the main roads. (Craigengelt is located 17km from the<br />

proposed wind energy development to the west).<br />

9.5.43 Table 9.6-1 in Appendix 9.6 presents the effects on all routes which were considered to be<br />

affected from the proposed wind energy development. In section 9.4, it was stated that the<br />

visual effects on the individual roads within the ZTV coverage was not likely to be significant.<br />

The general magnitude of the effects to the routes remains negligible. The main factor<br />

reducing any likelihood of significant effects occurring is the direction in which the roads run.<br />

No main routes head straight towards the site.<br />

9.5.44 From the above mentioned assessment, the following routes were chosen <strong>for</strong> the sequential<br />

cumulative assessment:<br />

• M9 between junction 7 and 9;<br />

November 2010 Chapter 9 Page 118<br />

Copyright <strong>Partnerships</strong> <strong>for</strong> <strong>Renewables</strong> <strong>Development</strong> Co. Ltd 2010 ©

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!