20.05.2014 Views

Forthbank Wind Energy Development - Partnerships for Renewables

Forthbank Wind Energy Development - Partnerships for Renewables

Forthbank Wind Energy Development - Partnerships for Renewables

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Forthbank</strong> <strong>Wind</strong> <strong>Energy</strong> <strong>Development</strong><br />

Preface<br />

This Environmental Statement (ES) reports the outcome of a <strong>for</strong>mal environmental impact assessment<br />

(EIA) of the proposed <strong>Forthbank</strong> wind energy development. It has been prepared to accompany a<br />

planning application to Clackmannanshire Council by PfR (<strong>Forthbank</strong>) Limited (PfR) to construct and<br />

operate a wind energy development on a site located immediately south east of Alloa,<br />

Clackmannanshire (national grid reference E289102, N691085).<br />

The EIA has been undertaken by the following project team:<br />

Table 1 Project Team<br />

Consultant Company Topic<br />

Steve Newlands/ Esther Villoria RPS Preparation of the ES, Project Management<br />

Michael Fenny RPS Legislative and Policy Context<br />

Garron Owen/ Dominica Baird RPS Hydrology, Hydrogeology and Geology/ FRA<br />

Helen Riley/ Thomas Goater RPS Ornithology<br />

Catarina Rei/ Thomas Goater RPS Ecology<br />

Dan Slatcher RPS Cultural heritage and Archaeology<br />

Luke Regan RPS Traffic, Access and Transport<br />

Katharine Blythe RPS Socio-Economics, Tourism and Land-Use<br />

Esther Villoria RPS Shadow Flicker and Climate Change<br />

Kerttu Ots/ Corinna Demmar RPS Landscape and Visual<br />

Matthew Cand/Ben Carlyle Hoare Lea Noise<br />

The ES comprises four separately bound parts:<br />

1. Non-Technical Summary (NTS) – summarising the findings of the EIA in a non-technical language<br />

2. Volume 1: Written Statement – reporting the findings of the EIA.<br />

3. Volume 2: Technical Appendices – technical material to support the main text presented in Volume<br />

1.<br />

4. Volume 3: Figures – the figures to accompany the text.<br />

Printed copies of the non-technical summary and ES (including figures and appendices) may be<br />

obtained from:<br />

<strong>Partnerships</strong> <strong>for</strong> <strong>Renewables</strong><br />

12 Melcombe Place,<br />

Station House,<br />

London,<br />

NW1 6JJ<br />

Email: Info@pfr.co.uk<br />

Telephone: +44 (0) 207 170 7000<br />

The non-technical summary is available free of charge, and a limited number of hard copies of the ES<br />

are available <strong>for</strong> £250 per hard copy. A limited number of CDs containing adobe acrobat files of the ES<br />

are available <strong>for</strong> £15 per CD. These charges are necessary to cover administrative costs. Alternatively,<br />

these documents can be downloaded from our website http://www.pfr.co.uk/<strong>for</strong>thbank.<br />

November 2010<br />

Copyright <strong>Partnerships</strong> <strong>for</strong> <strong>Renewables</strong> <strong>Development</strong> Co. Ltd 2010 ©

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!