<strong>Forthbank</strong> <strong>Wind</strong> <strong>Energy</strong> <strong>Development</strong><br />

stakeholders prior to construction. Further details are provided in Chapter 13 Hydrology,<br />

Hydrogeology and Geology.<br />

4.9.4 Enabling works will be required prior to the commencement of the main construction works.<br />

These works will be phased in the pre-construction period, and include:<br />

• detailed site investigation works;<br />

• identification of the aggressiveness of the leachate;<br />

• waste classification;<br />

• surface and groundwater monitoring; and<br />

• consultation with the appropriate authorities regarding turbine deliveries.<br />

Programme<br />

4.9.5 An indicative programme <strong>for</strong> construction activities is shown in Table 4.3. The starting date <strong>for</strong><br />

construction activities is largely a function of the date that consent might be granted and<br />

subsequently the programme will be influenced by constraints on the timing and duration of<br />

any mitigation measures confirmed in the individual technical chapters or by the planning<br />

decision. Following planning consent, a more detailed programme of works will be produced<br />

with the appointed construction contractors and agreed with Clackmannanshire Council.<br />

Table 4.3 Indicative Construction Programme<br />

Construction Operations<br />

Clearance of land<br />

Access tracks<br />

Construction compound<br />

Lay-down area<br />

Control building<br />

Crane hardstandings<br />

Turbine foundations<br />

Turbine erection<br />

Grid connection (underground cabling)<br />

Landscaping<br />

Construction Works and Delivery Times<br />

Month<br />

1 2 3 4 5 6<br />

4.9.6 For the purposes of this ES, construction activities have been assumed to take place between<br />

07:00-19:00 hours on week days and 07:00 and 16:00 on Saturdays. Work outside these<br />

hours is not usual, though if it was required to meet specific demands (e.g. during foundation<br />

pours, and some activities are highly weather dependent e.g. low wind speeds <strong>for</strong> turbine<br />

tower erection), permission <strong>for</strong> short-term extensions to these hours would be sought from<br />

Clackmannanshire Council as required.<br />

4.9.7 Quiet on-site working activities such as electrical commissioning have been assumed to extend<br />

outside these times where required.<br />

November 2010 Chapter 4 Page 11<br />