20.05.2014 Views

Forthbank Wind Energy Development - Partnerships for Renewables

Forthbank Wind Energy Development - Partnerships for Renewables

Forthbank Wind Energy Development - Partnerships for Renewables

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Forthbank</strong> <strong>Wind</strong> <strong>Energy</strong> <strong>Development</strong><br />

development site. There<strong>for</strong>e a series of monthly estuarine counts was undertaken between<br />

November 2009 to August 2010 with the aim of covering all stages of the tidal cycle (the time<br />

between two successive high tides, of approximately 12 hours duration) over the survey<br />

period.<br />

12.2.13 Surveys were conducted by an experienced ornithological surveyor from a single point on the<br />

south-western shore of the Forth Estuary (adjacent to the proposed wind energy development<br />

site) at Dunmore Home Farm (NS 8869 9041) overlooking the estuary. Coverage extended to<br />

1km upstream and downstream of the proposed wind energy development site.<br />

12.2.14 The survey area was split into six Zones (A-F). These are illustrated in Figure 12.1. Fiveminute<br />

counts were undertaken in each zone in sequence and repeated over a period of<br />

approximately 3hrs. All target species of conservation concern were recorded by entering<br />

count totals <strong>for</strong> each species during each five-minute observation period in a particular zone on<br />

to fieldwork <strong>for</strong>ms. Bird behaviour was recorded as either ‘feeding’ or ‘non-feeding’ and the<br />

number of birds observed <strong>for</strong> each category was recorded separately.<br />

12.2.15 Table 12.1.2, Appendix 12.1, presents a record of the dates, times and timings in relation to<br />

the tide when the individual estuary zone counts were conducted.<br />

Breeding Bird Surveys<br />

12.2.16 Breeding bird surveys were carried out in the spring and summer of 2010 following an adapted<br />

version of the BTO’s Common Bird Census methodology 14 15 with five visits completed<br />

between April and June inclusive. The survey area included the proposed wind energy<br />

development site plus a surrounding buffer of 500m as illustrated in Figure 12.1 while<br />

in<strong>for</strong>mation on the dates, timing and weather conditions of each survey is given in Table<br />

12.1.3, Appendix 12.1.<br />

Barn Owl Surveys<br />

12.2.17 Potential barn owl nest sites within 1km of the proposed wind energy development site were<br />

checked during an initial visit on 16 February 2010. In<strong>for</strong>mation from the Central Scotland<br />

Raptor Study Group (see Table 12.1, Scoping and Consultation Responses) was used to<br />

in<strong>for</strong>m the search <strong>for</strong> potential nest and roost sites.<br />

12.2.18 A follow up visit to check <strong>for</strong> occupancy was made on 2 July 2010. Surveys were based on the<br />

methods set out in Hardey et al. (2009) 16 . The coverage of the barn owl surveys is illustrated<br />

in Figure 12.1.<br />

Flight Activity (Vantage Point) Surveys<br />

12.2.19 These surveys are designed to record bird flight activity over the application site. The data<br />

gathered from these surveys allows an estimation of the numbers of each bird species passing<br />

through the airspace as well as providing an indication of their spatial and temporal use of that<br />

airspace.<br />

November 2010 Chapter 12 Page 6<br />

Copyright <strong>Partnerships</strong> <strong>for</strong> <strong>Renewables</strong> <strong>Development</strong> Co. Ltd 2010 ©

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!