<strong>Forthbank</strong> <strong>Wind</strong> <strong>Energy</strong> <strong>Development</strong><br />

15.3.36 Direct employment will be created at the proposed wind energy development, as well as<br />

employment in other activities associated with the development, such as design and<br />

development. In particular, a local source <strong>for</strong> aggregate will be identified to provide rock <strong>for</strong><br />

track and hardstanding construction.<br />

15.3.37 Indirect employment will also be created; this includes other jobs supported through the supply<br />

chain <strong>for</strong> the project, such as the construction of wind turbine components and, <strong>for</strong> example,<br />

the use of local recycling facilities during the de-commissioning of the turbines at the end of the<br />

operational life of the proposed wind energy development. There is also opportunity <strong>for</strong><br />

indirect benefits to occur using supply firms, accommodation establishments and other local<br />

services (e.g. newsagents, cafes/restaurants, petrol stations etc.) in the district.<br />

15.3.38 Additional “induced” employment will come through increased economic activity and<br />

employment in the area around the proposed wind energy development. As local incomes are<br />

increased, local spending also increases, helping to sustain local shops and services.<br />

15.3.39 Construction of the proposed wind energy development will include both electrical and civil<br />

engineering contracts and it is anticipated that a reasonable proportion of the cost of the<br />

construction work (around 25%) will be spent in the district on civil, electrical and connection<br />

works. PfR would encourage local firms to tender <strong>for</strong> the construction works as far as possible.<br />

This will be achieved through the identification of suitable local contractors during project<br />

development by means of local contracts and through public exhibitions as well as wideranging<br />

tender arrangements. Thereafter a database of local contactors will be drawn up <strong>for</strong><br />

use at the actual contracting stage of the project. The process is however subject to<br />

competitive tender and until any contracts are let it cannot be predicted how many local jobs<br />

are likely to be created.<br />

15.3.40 Accurate prediction of the regional and national sourcing of components is not possible at this<br />

stage. However, given the local expertise present within Clackmannanshire in, <strong>for</strong> example,<br />

utilities engineering, and infrastructure development, and the number of people employed<br />

locally in the construction industry, it is hoped that civil engineering, electrical infrastructure and<br />

grid connections, - and installation of turbines and design and development can be kept at<br />

least partly in the local area.<br />

15.3.41 Throughout the 25 year lifetime of the proposed wind energy development, the establishment<br />

of a local service team will be promoted.<br />

15.3.42 An operations manager will oversee day-to-day wind farm operations. Employees from the<br />

turbine manufacturer and/or suitably qualified contractors will carry out maintenance at regular<br />

intervals. Turbine maintenance will be carried out, along with any other maintenance required<br />

by manufacturers’ specifications and will likely include the following:<br />

• initial servicing;<br />

• scheduled routine maintenance and servicing;<br />

• unplanned maintenance or call outs; and<br />

• blade inspections.<br />

November 2010 Chapter 15 Page 9<br />